background image

Only work on the Hyland 920 during appropriate weather conditions to prevent injury of personnel.
Do not stand under unsecured objects during installation.
Please ensure all batteries are disconnected from the system prior to conducting work, and the 
Turbine is connected to the controller with it switched to ‘short’ to prevent the blades from spinning.

Dangers during installation or 

maintenance

The technical specifications and turbine dimensions are shown below. Diffuse Energy realise that 
each application is unique, and customers may require additional information. We welcome the 
opportunity to supply additional technical information.

Technical specifications

Physical dimensions

920 x 920 x 373 mm

Mass

18.5kg

Rated power output

220W

Rated wind speed

11m/s, 40km/h

Peak Current to Battery

20A (limited by breaker)

Peak Power

624 W @ 48 V nominal, 728 W @ 56V charge

Peak Power wind speed

15.5 m/s +, 55km/h+

Cut out wind speed (turbine 

stopped with remote system)

~19m/s, 70km/h

4

AUS

 

sales@valen.com.au    NZ  sales@valen.co.nz

Summary of Contents for Hyland 920

Page 1: ...AUSTRALIA 1300 734 253 sales valen com au www valen com au NEW ZEALAND 0800 734 253 sales valen co nz www valen co nz VALEN 920 WIND TURBINE OWNERS MANUAL VERSION 1 AUGUST 2021 ...

Page 2: ...aulty operation please refer to the Trouble Shooting section of this User Manual or contact us at sales valen com au Note please refer to the attached Hyland 920 Controller User Manual for instructions relating to the controller How to use this manual The components received from Valen are shown in the table below Check you recieved Component Quantity Hyland 920 Wind Turbine 1 Diffuse Energy MPPT ...

Page 3: ...hat turbine must be placed out of reach of personnel This means at least 2 7m above any platform below the turbine In the event that work is to be carried out closer to the turbine then it must be isolated by applying the short and work cannot commence above 40 km h wind speeds Mechanical dangers A breaker should always be installed between the battery and controller to allow electrical isolation ...

Page 4: ...al specifications and turbine dimensions are shown below Diffuse Energy realise that each application is unique and customers may require additional information We welcome the opportunity to supply additional technical information Technical specifications Physical dimensions 920 x 920 x 373 mm Mass 18 5kg Rated power output 220W Rated wind speed 11m s 40km h Peak Current to Battery 20A limited by ...

Page 5: ...ystem Passively aligns to the wind direction Rotor configuration 6 bladed horizontal axis downwind CO2 savings 1 000 kg yr above 5 m s 1 Rayleigh distribution assumed as per IEC61400 2 Section 3 60 2 Annual power generation based on Bureau of Meteorology wind speed records of 18 Australian airport sites Predicting the power output of wind turbines at a particular site can be difficult Diffuse Ener...

Page 6: ...following section outlines the installation procedure for the Hyland 920 wind turbine Telecommunications tower installation 1 Unpack turbine and check that all components are present Note that the turbine is preassembled and checked prior to delivery 2 Feed the system 3 core power cable recommend 12 AWG through the mounting pole The turbine is designed to be mounted on a length of 40 NB 48 3 mm OD...

Page 7: ...e two phases of the output to the battery through a breaker switch Set the breaker to off 13 On the turbine controller set the SHORT RUN switch to SHORT See image below 14 Remove the cable tie from the Turbine 15 Turn the battery breaker to on 16 On the turbine controller set the SHORT RUN switch to RUN 17 Assuming there is wind the MPPT controller will now power up Note The controller will not be...

Page 8: ...ine from the pole if necessary and allow turbine to yaw freely 7 Run cabling to the controller and connect the three phases of the turbine power to the controller 8 Connect the two phases of the output to the battery through a breaker switch Set the breaker to off 9 On the turbine controller set the SHORT RUN switch to SHORT See image below 10 Remove the cable tie from the Turbine 11 Turn the batt...

Page 9: ... as per manufacturer s instructions Turbine Plumbed vertical ELECTRICAL SYSTEM 20A breaker installed between controller and power system 10 AWG wires installed between controller and power system battery HYLAND 920 Yaw clamp tightened to 4 Nm Turbine is tracking wind tower vertical 9 INDUSTRIAL BATTERY ENERGY STORAGE SOLUTION PROVIDER AUS 1300 734 253 NZ 0800 734 253 ...

Page 10: ...ts are expected For remote area operation we can supply an automated system that will protect the controller For details contact us NB By March 2021 the high wind protection will be integral to the controller it will cause the turbine to shut down at 75km h High wind conditions There are no maintainable components on the Hyland 920 wind turbine Diffuse Energy recommends a visual inspection after s...

Page 11: ...itches to RUN Damaged blades Check blades for visual damage If blades are damaged contact sales valen com au Stiff generator bearing Switch BRAKE RUN and SHORT RUN switches on the controller to the BRAKE and SHORT positions respectively Try to rotate turbine shaft If shaft is stiff contact sales valen com au Stiff yaw bearing Switch BRAKE RUN and SHORT RUN switches on the controller to the BRAKE a...

Page 12: ...cuit Switch BRAKE RUN and SHORT RUN switches on the controller to the BRAKE and SHORT positions respectively Contract qualified electrician to check electrical circuit Repair by authorised personnel Turbine spins in windy conditions but makes no power Check continuity between phases at controller plug Check battery state of charge Check charge light on controller if red there is a fault If there i...

Page 13: ...al connections by authorised personnel High electric cable resistance Check cable cross section and lengths with recommended dimensions in Wiring Specifications Replace with higher cross section cable Damaged blades Check blades for visual damage If blades are damaged contact sales valen com au If you require further assistance please contact us using the details on the back page Further Support 1...

Page 14: ... SAFETY CERTIFIED ISO 45001 2018 OBSEQUENTIA QUALITY CERTIFIED IS0 9001 2015 OBSEQUENTIA ENVIRONMENT CERTIFIED ISO 14001 2015 Company Details Legal Entity Valen Power Pty Ltd ACN 134 028 961 Telephone 1300 734 253 ...

Reviews:

Related manuals for Hyland 920