21
Thermo DC 200
Installation of the heater - fitting of important assemblies
11.3. Installation of the circulation pump
Consider the information regarding the installation provided in the
documentation of your circulation pump. Note the installation position!
Refer to Section 9.
NOTE:
The pump ports and connection lines from the water intake and water
outlet must be flush (no stress).
ATTENTION:
If the pump is not controlled by the heater, its operation is to be en-
sured by all means during whole heater operation (initial cycle,
heating operation and purge cycle). At least turn on the Thermo DC
and pump at the same time, but ensure the operation of the pump
by an appropriate control circuit at least 2 to 3 min. after switching-
off the heater.
Summary of Contents for THERMO DC 200
Page 4: ...IV Thermo DC 200...
Page 39: ...memos...