Проверил: Р.Ч./22.08.2018г
6
ELECTRICAL REQUIREMENTS
Connect the main leads to a standard 230V+10% (50Hz+1Hz) electrical supply which has
protection devices of under-voltage, over-voltage, over-current as well as a residual current
device (RCD) which maximum residual current rated at 0.03A.
SET UP AND PREPARATION FOR OPERATION
Before operating the log splitter, the Bleed Screw should be loosened by some
rotations until air can go in and out of the oil tank smoothly.
Air flow thru the Bleed Screw hole should be detectable during the log splitter is
under operations.
Before moving the log splitter, make sure the Bleed Screw is tightened to avoid oil
leaking from this point.
FAILED TO LOOSEN THE BLEED SCREW WILL KEEP THE SEALED AIR IN HYDRAULIC
SYSTEM BEING COMPRESSED AFTER BEING DECOMPRESSED. SUCH CONTINUOUS
AIR COMPRESSION AND DECOMPRESSION WILL BLOW OUT THE SEALS OF THE
HYDRAULIC SYSTEM AND CAUSE PERMANT DAMAGE TO THE LOG SPLITTER.
Max Pressure Limiting Screw
DO NOT ADJUST THE MAX PRESSURE
LIMITING SCREW !
Max pressure was set before the log
splitter ex work and the max pressure
limiting screw is sealed with glue to
ensure the log splitter works under
pressure no more than 4 tons. The
setting
was
done
by
qualified
mechanic
with
professional
instruments.
Unauthorized resetting will cause the
hydraulic pump fail to output enough
splitting pressure or
RESULT IN
SERIOUS INJURY AS WELL AS DAMAGE TO
THE MACHINE .
Summary of Contents for 0503LGS5202
Page 27: ...22 08 2018 27 5 PREMIUM 0503LGS5202...
Page 28: ...22 08 2018 28 60 75...
Page 29: ...22 08 2018 29 10 2 5 2...
Page 30: ...22 08 2018 30...
Page 31: ...22 08 2018 31 3 6 6 6 7 8 8...
Page 33: ...22 08 2018 33 4...
Page 34: ...22 08 2018 34 ZHB 90o...
Page 35: ...22 08 2018 35 2...
Page 36: ...22 08 2018 36 150 4 2 2...
Page 37: ...22 08 2018 37 SHELL Tellus 22 MOBIL DTE 11 ARAL Vitam GF 22 BP Energol HLP HM 22...
Page 38: ...22 08 2018 38 3 4...
Page 39: ...22 08 2018 39...