28
Installation Instructions
Connect Cables
• Valve to Collector Ring:
Connect the cable from collector ring to the first valve. See Figure 28-1.
• Valve to Valve:
Connect 10 ft cable (with valve) to the VDC OUT port on an Inner valve, then route to the
next valve location and connect to the VDC IN port. See Figure 28-1.
• Valve to Power Supply Tower Box or GPS Tower Box:
»
Connect the tower box inner valve cable to the inner valve VDC OUT port. See Figure 28-1.
»
Connect the tower box outer valve cable to the outer valve VDC IN port.
NOTE
• Special attention should be taken when plugging in any connectors. Connectors are keyed and
orientation is labeled with an arrow, however with enough force the connectors can be inserted
incorrectly.
• A power supply tower box is required every 50 valves or less, or every 1000 ft or less, whichever
comes first.
VDC IN
VDC IN
VDC IN
VDC OUT
VDC OUT
2
2
4
1
3
Figure 28-1 1. Collector Ring
2. Valve
3. Power Supply or GPS Tower Box
4. Optional Valve
Summary of Contents for VRI-iS
Page 2: ...2 This page was left blank intentionally...
Page 44: ...This page was left blank intentionally 44 Setup...
Page 50: ...50 Field Install and Wiring Diagrams VRI iS Power Supply Tower Box Field Install pn 9312421...
Page 51: ...51 Field Install and Wiring Diagrams VRI iS Power Supply Tower Box Wiring Schematic pn 0999334...
Page 52: ...52 Field Install and Wiring Diagrams VRI iS GPS Position Tower Box Field Install pn 9312419...
Page 53: ...53 Field Install and Wiring Diagrams VRI iS GPS Position Tower Box Wiring Schematic pn 0999346...
Page 82: ...82 Troubleshooting This page was left blank intentionally...
Page 102: ...102 Parts This page was left blank intentionally...