20
Installation Instructions
Setup Control Panel for GPS Position
ICON5 / ICONX - Set Current Method
To setup the GPS position type in the control panel
do the following:
1. Make sure the GPS pivot position tower box with
GPS antenna is positioned near the collector ring
and wired into either the control panel or collector
ring.
2. Set percent timer to 0.0% (zero percent).
3. Set water to off.
4. Push a
Start
button to start the machine, ener-
gize the safety circuit and the GPS Position tower
box.
5. Comm Port setup. See Figure 20-1.
(a) Push
Menu
,
Setup
,
Comm Port
, and
RJ11
.
(b) Select the
RJ11 Protocol
field and choose
VRI-iS
from the drop-down list.
GPS V2 is automatically enabled with the
VRI-iS protocol.
1
2
3
4
5
Figure 20-1 1. Menu
2. Setup
3. Comm Port
4. RJ11
5. RJ11 Protocol
Summary of Contents for VRI-iS
Page 2: ...2 This page was left blank intentionally...
Page 44: ...This page was left blank intentionally 44 Setup...
Page 50: ...50 Field Install and Wiring Diagrams VRI iS Power Supply Tower Box Field Install pn 9312421...
Page 51: ...51 Field Install and Wiring Diagrams VRI iS Power Supply Tower Box Wiring Schematic pn 0999334...
Page 52: ...52 Field Install and Wiring Diagrams VRI iS GPS Position Tower Box Field Install pn 9312419...
Page 53: ...53 Field Install and Wiring Diagrams VRI iS GPS Position Tower Box Wiring Schematic pn 0999346...
Page 82: ...82 Troubleshooting This page was left blank intentionally...
Page 102: ...102 Parts This page was left blank intentionally...