3 MONTHS OR 200 BALES
1. Lubricate PTO driveline (2 locations).
See Fig. 24.
2. Lubricate sealed bearings with 1 shot
of grease:
A. Front rotor bearing.
B. Auger bearing.
C. Rear rotor bearing.
D. Rear blower bearing.
Machine is shown with guard
removed for illustrative purposes
only. Do not operate machine with
guard removed.
WARNING
Fig. 26 FRONT INPUT AND AUGER BEARINGS
Fig. 27 REAR ROTOR BEARING
A
B
C
D
SERVICE & MAINTENANCE
33
Summary of Contents for H Series
Page 1: ...ROUND BALE GRINDER MODEL H OPERATOR S MANUAL AND PARTS BOOK INC FARM EQUIPMENT MANUFACTURER...
Page 6: ...2...
Page 31: ...Fig 23 MANGER FEEDING OPERATION 27...
Page 34: ...OPERATION 30...
Page 46: ...SERVICE MAINTENANCE 42...
Page 52: ...7 4 HYDRAULIC CIRCUIT SPECIFICATIONS 48 GRATE CYLINDERS TO TRACTOR...
Page 53: ......
Page 66: ...H C R PPE PPER CH 16 8 7 10 9 11 4 15 14 1 13 12 2 6 5 3 17 CUVE TUB D 9 10 17 18 19...
Page 69: ...1 5 9 2 3 4 6 8 17 CHUTE MANUELLE MANUAL CHUTE E 7 7 6 2...
Page 75: ...1 3 5 2 4 17 CHUTE MANUELLE D FLECTEUR MANUAL CHUTE DEFLECTOR H 6 6 4 2 8 10 12 9 7 9 11...
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......
Page 85: ......