10.3 Sealing floor front - all installations.
Using the floor sealing tape supplied, seal the
bottom of the hotbox to the fireplace and hearth
floor (See figure 22).
Make sure that the whole length of the front
edge of the hotbox is fully sealed.
11. BURNER & SUPPLY PIPE INSTALLATION
11.1 Fitting the burner.
1.
Place the burner module into the hotbox.
2.
Refit the burner cover by lowering it onto the burner
module. The front edge of the burner cover should locate
in front of the burner module. The sides of the burner
cover should locate behind the front of the burner module.
Secure with two screws removed previously (See figure
23)
3.
Refit the Inner Reflector into the hotbox. Be careful not
to scratch the top surface of the burner cover. Secure
using six screws removed previously.
4.
Refit the spillage plate. Secure using the four screws
removed previously.
11.2 Supply pipe installation.
A nut and olive is provided for an 8mm-pipe inlet
connection directly to the gas control. The isolating ‘T’
connector can be rotated to allow a connection from any
direction. The ‘T’ connector includes a valve for isolating
the gas supply.
The supply pipe must be rigid material. Flexible pipe must not be used. Connect the
supply line to the appliance.
Turn on the gas supply and pressure check the installation pipework for gas
soundness. In the United Kingdom (GB) check in accordance with the current edition
of BS 6891. In the Republic of Ireland check in accordance with the current edition of
IS 813 “Domestic Gas Installations”.
Page 26
©
Baxi Heating U.K. Limited 2008.
Figure 22. Floor sealing
Figure 23. Burner cover
location
INSTALLER GUIDE