CONTENTS (Continued)
Section
Heading
Page
8. CONTROL AND PRESSURE CHECKS
22
8.1 Check control settings.
22
8.2 Flame supervision and spillage monitoring system.
22
8.3 Check burner pressure.
23
9. SPILLAGE CHECK
23
10. FINAL ASSEMBLY & BENCHMARKING SCHEME
24
11. FINAL REVIEW
25
12. SERVICING AND PARTS REPLACEMENT
26
12.1 To remove the window unit.
27
12.2 To remove the fascia.
27
12.3 To remove the ceramic fuel effect.
27
12.4 To remove the gas tap.
27
12.5 To remove the piezo generator.
28
12.6 To grease the control tap.
28
12.7 To remove an injector.
28
12.8 To remove the complete burner module, pipes and pilot.
29
1. IMAGE
INSTALLER GUIDE
©
GDC Group Ltd. JAN 2017
Page 6