1
4002418-09
The installation of this kit affects the framing and method of
installing the 530 heater.
Installation Sequence
1. Frame the cavity.
2. Install the heater with stud brackets, stand-offs, insulation, wall switch
kit, and cement board.
3. Gas fit and vent heater.
4. Drywall only (no tile, etc.).
5. Assemble and install the mounting frame.
6. Install finishing material (tile, etc.). Finish around or under 570 Finishing
Plate if using it.
7. Install the trim panel fitted with the barrier screen.
Note: This kit must be
installed or serviced by a
qualified installer, service
agency or gas supplier.
These instructions are to be
used in conjunction with the
main installation instructions
for the above listed heater
model.
Ledge Fronts 569
Approved for use with
Valor heater models 530IN/IP ONLY
Not compatible with 530INI/IPI insert heaters
HOT GLASS
WILL
CAUSE BURNS.
DO NOT TOUCH
GLASS
UNTIL COOLED.
NEVER
ALLOW CHILDREN
TO TOUCH GLASS.
DANGER
!
A barrier designed to reduce the risk of burns from the hot
viewing glass is provided with this appliance and must be
installed for the protection of children and other at-risk
individuals.
INSTALLER: Leave this
manual with the appliance.
CONSUMER: Retain this
manual for future reference.
INSTALLATION MANUAL
Portrait
© Copyright Miles Industries Ltd., 2020.