Valtir.com
15
Revision D February 2023
Attaching the Angle Strut
1. Place the Angle Strut (PN 33463G) on the outside flanges of the HBA Bottom Posts (PN
33873A) at the base of Posts 1 and 2.
2. At Post No. 1, insert a 19 mm diameter x 64 mm hex head bolt (PN 3717G) through the Angle
Strut (PN 33463G) and into the 21 mm hole (on the field side) of the post plates (ears) on the Top
and Bottom Posts. The bolts should be positioned so the nuts are on the inside of the post plates
(ears) (see Figures 4 and 5).
3. Place a 19 mm flat washer PN 3701G), and 19 mm lock washer (PN 4699G) between the 19
mm hex nut (PN 3704G) and the post plates (ears) on the Top and Bottom Posts (see Figures 4
and 5)
4. At Post No. 2, insert a 19 mm diameter x 76 mm hex head bolt (PN 3718G) through the Angle
Strut (PN 33463G).
5. Place three (3) 19 mm flat washers (PN 3701G) between the Angle Strut (PN 33463G) and the 21
mm hole (on the field side) of the post plates (ears) on the Top and Bottom Posts at Post No. 2
(see Figures 4 and 5).
6. Next insert the 19 mm diameter x 76 mm hex head bolt (PN 3718G) through the 21 mm hole (on
the field side) of the post plates (ears) on the Top and Bottom Posts. The bolts should be
positioned so the nuts are on the inside of the post plates (ears) (see Figures 4 and 5).
7. Place a 19 mm flat washer (PN 3701G) and 19 mm lock washer (PN 4699G) between the
19 mm hex nut (PN 3704G) and the post plates (ears) on the Top and Bottom Posts (see
Figures 4 and 5)
Important:
There is no torque requirement for these bolts. They should be
tightened to a snug position. Do not over tighten these bolts.
Deploying C120 Posts
On a tangent line with HBA Pos #1 and #2, designate C120 Posts #3, #4, #5, and #6 assembly
locations in increments of 2000 mm.
Option (1)
Drive the C120 Posts (PN 6183G) with an approved driving head to the
appropriate depth(s), approximately 1300 mm (see Figure 6).
Option (2)
To facilitate placing Posts in extremely hard soil
,
drill a 130 mm pilot hole
approximately 1300 mm deep and force the C120 Post (PN 6183G) to the
appropriate depth by impact or vibratory means with an approved driving head.
If option (2) is used, material should be placed in 150 mm lifts and compacted with
pneumatic equipment to optimum compaction.
Summary of Contents for EURO-ET END TERMINAL
Page 1: ...PN 619489 REVISION D FEBRUARY 2023 EURO ETTM END TERMINAL PRODUCT DESCRIPTION ASSEMBLY MANUAL...
Page 24: ...Valtir com 23 Revision D February 2023 EURO ET Drawing...
Page 25: ...Valtir com 24 Revision D February 2023 Notes...
Page 26: ...Valtir com 25 Revision D February 2023 Notes...