V-460/610 Series Operating Instructions Ver.2.04E
51
5
Using scissors, cut the new center-dry tape in a
length 10mm longer than the length of the
pressure lever (5mm each to the left and right).
6
Fold the center-dry tape along edges so that the
excess tape over the seal receiving plate adheres
to the other side of the plate.
Pressure lever
Sponge holder
Attention
Apply the tape so that the nonadhesive
central part of the tape covers the heating
element.
Make sure there is no wrinkles on the tape.
Wrinkles will negatively affect the sealing
surface.
Summary of Contents for V-460 Series
Page 61: ...V 460 610 Series Operating Instructions Ver 2 04E 61 ...
Page 66: ...V 460 610 Series Operating Instructions Ver 2 04E 66 12 Electric diagram 110V ...
Page 67: ...V 460 610 Series Operating Instructions Ver 2 04E 67 220V ...
Page 68: ...V 460 610 Series Operating Instructions Ver 2 04E 68 13 Piping diagram V 460 610 series ...
Page 69: ...V 460 610 Series Operating Instructions Ver 2 04E 69 V 460 610C series ...
Page 75: ...V 460 610 Series Operating Instructions Ver 2 04E 75 ...