5000/10000 FLYWHEEL GRINDER
MACHINE SET-UP
1. Remove protective covering from around machine. Remove bolts from four corner pads to
free machine from skid. Remove all tooling packages from machine and set aside. Using
the fine feed handknob, raise the grinding head motor off the wood shipping block and
discard. Unlock the grinding head column lock handle (Figure 1) and swing the grinding
head motor so it is centered over the table. Relock the motor flange.
Figure 1
2. A forklift is recommended for removing the machine from the skid and setting in place. Lift
only from the base cabinet
from the rear
(Figure 2).
Figure 2
Van Norman
18.
888-855-1789
Summary of Contents for FG10000
Page 2: ......
Page 4: ......
Page 11: ...5000 10000 FLYWHEEL GRINDER STANDARD EQUIPMENT FG5000 FG10 000 Van Norman 7 888 855 1789...
Page 21: ...5000 10000 FLYWHEEL GRINDER MACHINE DESCRIPTION Van Norman 17 888 855 1789...
Page 41: ...5000 10000 FLYWHEEL GRINDER ASSEMBLY DRAWING Van Norman 37 888 855 1789...
Page 42: ...5000 10000 FLYWHEEL GRINDER ASSEMBLY DRAWING Van Norman 38 888 855 1789...
Page 43: ...5000 10000 FLYWHEEL GRINDER ASSEMBLY DRAWING Van Norman 39 888 855 1789...
Page 44: ...5000 10000 FLYWHEEL GRINDER ASSEMBLY DRAWING Van Norman 40 888 855 1789...
Page 81: ......