5000/10000 FLYWHEEL GRINDER
FILL OIL RESERVOIR (continued)
Figure 9
After installation, the oil level in the plastic container will start to drop. The base of the oiler
has been preset at the factory to the proper height. When the oil level in the reservoir in the
base casting reaches the preset height the level in the plastic container will stabilize. It may
be necessary to refill the container after level has stabilized.
Figure 10C
3. A depth gage is provided with the machine for checking the oil level through the hole in the
table (Figure 10A). The overall length of the gage pin should be set to equal the thickness
of the machine table (Figure 10B). Set pin to bottom of table and tighten set screw on side
of gage (Figure 10C). The oil level line marked on the gage pin is 1/16” above the bottom of
the table.
Figure 10A
Figure 10B
4. In the center hole of the table is a 7/16”-14 set screw. This was installed during shipping of
the machine to keep any debris out of the hole. Remove set screw and discard.
Van Norman
21.
888-855-1789
Summary of Contents for FG10000
Page 2: ......
Page 4: ......
Page 11: ...5000 10000 FLYWHEEL GRINDER STANDARD EQUIPMENT FG5000 FG10 000 Van Norman 7 888 855 1789...
Page 21: ...5000 10000 FLYWHEEL GRINDER MACHINE DESCRIPTION Van Norman 17 888 855 1789...
Page 41: ...5000 10000 FLYWHEEL GRINDER ASSEMBLY DRAWING Van Norman 37 888 855 1789...
Page 42: ...5000 10000 FLYWHEEL GRINDER ASSEMBLY DRAWING Van Norman 38 888 855 1789...
Page 43: ...5000 10000 FLYWHEEL GRINDER ASSEMBLY DRAWING Van Norman 39 888 855 1789...
Page 44: ...5000 10000 FLYWHEEL GRINDER ASSEMBLY DRAWING Van Norman 40 888 855 1789...
Page 81: ......