SECTION 3: INSTALLATION
AIR N ARC
®
150 SERIES
PAGE - 14
090051-OP_r0 (FEB-2014)
Vanair Manufacturing, Inc.
vanair.com • 800-526-8817
Refer to
Sections 7.11A
through
7.11C
for
Installation and Dimension
diagrams,
and the following instructions.
1. Remove packing and inspect the
machine and control panel for
shipping damage.
2. Check fluid levels, if needed.
Refer to the Engine Operation
Manual for engine oil.
3.3 SERVICE BODY PREP
Consult
Sections 7.11A
through
7.11C
for
Installation and Dimension
(dimensional)
requirements, and the following
instructions.
1. Drill four (4) 1/2” mounting holes
in the service body floor in a
square pattern at the desired
mounting location. Ensure that all
proper machine clearances will
be maintained.
3.4 MACHINE PACKAGE
MOUNTING
When determining package position on
vehicle, be aware of the minimum space
requirements needed for cooling and
circulation, and also package access for
performing maintenance (see
Sections
7.11A
through
7.11C
for
Installation and
Dimension
diagrams). To prepare the
machine for mounting, follow the
succeeding procedure:
1. Unbolt the unit from the skid:
remove the mounting nuts, lock
washers, washers and mounting
bolts securing the machine to the
shipping crate.
2. Using a proper hoist, lift and
place the unit in a preliminary
position on the service body of
the vehicle so that access is
easily attained, and there is
enough space surrounding the
mounting area for cooling
purposes.
3. Leaving the unit in the preliminary
position, connect the ground
cable to the unit battery, and
check all fluid levels (
NOTE:
vehicle should be on a level
surface in order to get accurate
fluid level checks).
4. Move the unit into its final location
for mounting, while positioning
the control trunk line and all other
connections.
5. Bolt the machine down with four
(4) 3/8” bolts inserted up from the
bottom through the four mounting
bolt holes of the base frame. See
Sections 7.11A
through
7.11C
for
Installation and Dimension
diagrams.
Start the unit and fully test all functions.
Warm the unit to full operating
temperature. After the unit has cooled,
check all fluid levels and add as needed.
NOTE
It is recommended that the machine be
mounted on a vibration isolating material
such as 1/4” neoprene rubber pads.
Isolating Dampeners (Part Number
PR93969) are available by calling your
local dealer.