background image

 

© October 2021 Van Essen Instruments. All rights reserved. 

www.vanessen.com 

Deployment 

Step 9   Connect the Equipment 

Connect the DXT Cable and Diver to the Diver-Link and mount the Well Top Fixation. 
 

 

It is recommended to mount the Well Top Fixation to the cable in the office. Under these 
circumstances you can make sure that your Diver will be installed at the correct depth. 

 

Please consider depth of water-table fluctuation and pressure range of Diver: 

www.vanessen.com/calculator-tools/cable-length

. 

 

Make sure all connectors are tightened properly, do not over-tighten. 

 

Keep good record of which hardware set goes to which monitoring point. 
 

 

Diver-Link Product Manual

, section 2.6 Deployment. 

Step 10   Activate the Diver-Link  

Activate the Diver-Link with the magnetic key. 
 

 

Hold the magnet on the ACTIVATE position for more than 1 second; until the top LED 
indicator turns green. 

 

If the activation process does not return 4 green LED indicators, then retry the activation up 
to 2 times before further troubleshooting. 
 

 

Diver-Link Product Manual

section 2.6.1 Activating the Diver-Link. 

Step 11   Check the Hardware Information in Diver-HUB  

Check Diver-HUB to see if the hardware information is displayed correctly. 

 

Check the Equipment information on the Monitoring Points widget details page. 

More information 

 

Diver-Link Product Manual:  

https://www.vanessen.com/wp-content/uploads/2019/09/Diver-Link-DN4xx-ProductManual-
en-1.pdf

 

 

Diver-HUB Getting Started Guide:  

https://www.vanessen.com/wp-content/uploads/2019/09/Diver-HUB-Getting-Started-Guide-
en.pdf

 

Reviews: