TENT PITCHING INSTRUCTIONS
–
GENESIS 400/500 (UK)
FLYSHEET FIRST PITCHING:
•
Open out inner and position in required direction.
•
Peg out the four main corners of the tent using the pegs supplied
•
Locate inflating points at the base of each beam
•
Access the beams through the zipped entry points and through the side door
•
For the first use of the AirBeam, fully unscrew all the valves from the AirBeams and
screw back in carefully before inflating - this ensures that the valve is not cross-
threaded.
•
Remove smaller screw-cap on valve and insert pump nozzle, of the Vango
AirBeam™ pump supplied
•
Inflate all tubes to 7psi. The tubes MUST be guided into an arch as they are inflated.
•
Final tube pressure MUST NOT exceed 8psi
•
DO NOT OVER-INFLATE THE BEAMS
•
Start with the centre tube and guide the beam into an upright position while it is
inflating
•
Inflate the other beams.
•
Remove pump & tighten screw-cap. Ensure both parts of valve are well fitted so it is air tight but do not over tighten.
•
Ensure the tent is in a straight line
•
The groundsheet should be flat and wrinkle free
•
Peg out the remaining poles and pegging points using pin pegs at the base of poles
•
Peg out ALL guy lines using pin-pegs ensuring that guy line fabric attachment points are evenly tensioned.
Reposition and adjust tensioning where necessary
CORRECT PUMP SET-UP:
• Pump Body Ř Pressure Valve
> Pressure Gauge > Hose
•
(Ensure the valve/gauge/hose are connected to the inflation port of the pump)
INNER ATTACHMENT:
•
Open out inner tent inside flysheet and position doorways to correspond with the living area
•
Starting from the rear corners of the tent, attach the elasticated hooks on the groundsheet to
corresponding rings on the flysheet
•
Suspend the inner by attaching toggles of inner tent through rings on inside of flysheet
•
Do the rear first and work forward
TENSION BAND SYSTEM:
•
Remove Tension Band System from pockets and attach into the corresponding clips at the apex of the pole
•
Adjust the straps until they are taut
•
DO NOT OVERTENSION. Excess tension will alter the shape of the tent
TO DEFLATE THE AIRBEAM TENT:
•
Unscrew the valve fully from the beam, taking care as the valve will be under pressure from the air inside the tube.
IN THE UNLIKELY EVENT OF A PUNCTURE:
•
Note - most apparent punctures are the result of the valve not being screwed in correctly. Please check the valves before changing the AirBeam in
question
•
Deflate the air beam. Unzip the internal flysheet sleeve which contains the affected beam.
•
Remove the tube and its protective outer.
•
The zips for the protective outer are cable tied together to prevent accidental access. Cut the cable tie and open the zip.
•
DO NOT open these zips when the tube is inflated.
•
Remove the clear rubberised tube from the protective sleeve taking care when removing the valve from the sleeve.
•
Partially inflate the tube and pass through a bucket or basin of water, looking for air bubbles. This will indicate location of puncture
•
Use the repair patch provided and cover hole, using instructions on patch. Re-insert tube into protective outer, closing zip from both ends, so that zip
pullers are in the flysheet sleeve (this might be easier with the tube partially inflated)
………………………………………………………………………………………………………………………………………………………………………………………….....