www.fmiproducts.com
125525-01E
21
INSTALLATION
Continued
Figure 31 - Installing Front Left Log
Figure 32 - Installing Front Right Log
Front Left
Log
Front Right
Log
Grate
Prong
4. Position front right log against right side
of grate prongs (see Figure 32).
5. Place top left front log onto front left log.
Match the rectangular projection on top
of front left log with the rectangular hole
on the bottom of the top left front log. The
top left front log will rest on top of the front
left log (see Figure 33).
Figure 33 - Installing Top Left Front Log
Front Top
Left Log
Front Top
Right Log
Rectangular
Projection
Rectangular
Projection
Rectangular Hole
Underneath
Rectangular Hole
Underneath
Figure 34 - Installing Top Right Front Log
6. Place top right front log onto front right log.
Match the rectangular projection on top of
the front right log with the rectangular hole
on the bottom of of the top right front log
as shown in Figure 34. The top right front
log will rest on top of the front right log.
7. Place the middle log onto the ramp log as
shown in Figure 35, page 22. The middle
log has two tabs on the bottom to position
from left to right on the ramp log. The front
of the middle log should be touching the
front left and right top logs.