www.fmiproducts.com
125502-01D
17
INSTALLATION
Continued
Figure 20 - Installing Left, Center and
Right Crossover Logs
Right
Crossover
Log
Left
Crossover
Log
Center
Crossover
Log
Square Peg
on Rear Log
Square
Peg on
Middle
Log
Round
Peg on
Front Log
Round Peg
on Center
Log
LVD18-PP AND LVD24-PP
1. Place rear log (#1) onto base. Holes in
bottom of log must seat over pins on base
as shown in Figure 21.
2. Place middle log (#2) onto base. Holes in
bottom of log must seat over pins on base
as shown in Figure 21.
Figure 21 - Installing Rear and Middle
Logs
Burner
Middle Log
Rear Log
Pin for
Hole in
Bottom
of Log
Figure 22 - Installing Front Log
Figure 23 - Installing Left and Right Logs
Front Log
Grate
Left Top
Log
Square Peg
on Rear Log
Right
Top
Log
Round
Peg on
Front Log
3. Place front log (#3) onto grate as shown
in Figure 22.
4. Place left top log (#4) as shown in Figure
23. Match square peg on top of rear log
(#1) with square hole on bottom of left top
log (#4). Match round peg on top of middle
log (#2) with round hole on bottom of left
top log (#4).
5. Place right top log (#5) as shown in Figure
23. Match square peg on top of rear log
(#1) with square hole on bottom of right
top log (#5). Match round peg on top of
front log (#3) with round hole on bottom
of right top log (#5).
Round
Peg on
Middle
Log