 4.3       BOILER START-UP 

A.

 

Close blow down, drain and steam stop valves. 

B.

 

Open the feedwater and sight gauge valves 

C.

 

Manually fill the boiler with water to approximately the middle of the 

sight gauge 

WARNING 

ENERGIZING THE HEATING ELEMENTS BEFORE FILLING THE BOILER TO ITS 

PROPER WATER LEVEL WILL DAMAGE THE HEATING ELEMENTS, THUS 

VOIDING THE WARRANTY.  EVEN THOUGH A LOW WATER CUTOFF IS 

PROVIDED WITH THE BOILER, THE BOILER SHOULD NEVER BE SWITCHED 

ON WITHOUT FIRST ASSURING THAT THE WATER LEVEL IS NORMAL 

 

4.3.1

 

Control Circuit Checkout 

If  a  separate  branch  circuit  is  provided  for  the  120V  control,  close  the 

customer’s 120V branch circuit power switch; if a control circuit transformer 

is provided, remove both the primary and secondary  fuses and  jump a 120V 

power supply to the secondary of the control transformer. 

A.  Switch the control circuit power on, the switch should light to indicate 

that the control circuit power is energized.   

B.    Circuits  of  heating  elements  will  now  be  switched  on  by  the  step 

controller or pressure controllers, and pilot lights will light indicating 

that  this  function  is  taking  place  and,  thus,  that  the  controls  are 

operating correctly. 

 

NOTE:  IF A CONTACTOR “CHATTERS”, BLOW IT OUT WITH AIR AND THEN CYCLE 

IT  SEVERAL  TIMES  BY  USING  THE  APPROPRIATE  MANAUL  ENABLE 
TOGGLE SWITCH. 

 

For  boilers  supplied  with  step  controls,  check  the  recycle  feature  by  briefly 

interrupting the control power – the step control should recycle and start in a 

no-  load  condition.    Perform  maintenance  checks  of  the  control  circuit  per 

paragraph 5.2 

Summary of Contents for STR

Page 1: ...Page 1 of 18 Vapor Power International LLC 551 S County Line Road Franklin Park Il 60115 Phone 630 694 5500 Fax 630 694 2230 Instruction Manual STR MODEL RESISTO FLO ELECTRIC BOILER...

Page 2: ...compact packaged unit requiring a minimum of electrical and plumbing connections at the jobsite When installed according to these instruction the boiler will provide years of reliable low maintenance...

Page 3: ...lation drawing and also that it is in accordance with the minimum spacing specified on the UL label if provided CAUTION ALL BOILERS EXCEPT MODELS STR 1638 THRU 1654 ARE TO BE MOUNTED ON NONCOMBUSTIBLE...

Page 4: ...Minimum thermal clearances should be maintained If the boiler is UL listed minimum clearances will be indicated on the UL Label Otherwise consult local codes and use good engineering judgement CAUTIO...

Page 5: ...NDED THAT ALL PIPING BE CHECKED FOR LEAKS BEFORE INSULATING 2 2 WATER SUPPLY AND CONDENSATE RETURN If a direct water feed is used ie no condensate return the main water supply must have a pressure at...

Page 6: ...ITATE DRAINING THE BOILER BY GRAVITY IE WITHOUT BOILER PRESSURE 2 3 1 SURFACE BLOWDOWN If the boiler is supplied with an automatic surface blow down valve pipe to a point common with the bottom blowdo...

Page 7: ...which must swing freely and point to the index mark on the case 2 7 HYDRO TEST Good practice as well as most local codes dictates that a hydro static test at a pressure equal to the safety valve setti...

Page 8: ...ple conductors per phase be certain that phasing is correct and that circuits are not mixed before energizing the boiler 3 2 GROUNDING Connect an equipment ground minimum copper wire size is indicated...

Page 9: ...such materials must be removed from the boiler prior to start up D All power wiring connections should be checked to assure tight connections NOTE HYDRO STEAM INDUSTRIES AS MANUFACTURER OF THIS BOILER...

Page 10: ...e vendor supplied literature provided at the rear of this manual 4 2 2 Pressure Control Boilers supplied with one or more non proportioning pressure controls Smaller STR boilers are provided with one...

Page 11: ...customer s 120V branch circuit power switch if a control circuit transformer is provided remove both the primary and secondary fuses and jump a 120V power supply to the secondary of the control transf...

Page 12: ...water prior to their addition to the boiler The boil out can be accomplished per the following procedure 1 Remove all tools rags etc from the boiler 2 Remove steam outlet piping 3 Fill boiler to just...

Page 13: ...establish a load on the boiler Individually check each element circuit to assure that each leg is drawing its rated current NOTE SOME POWER FUSES MAY BLOW AT STARTING DUE TO WATER OR OTHER CONTAMINATI...

Page 14: ...all circuits draw rated current no element tests are required If element failure is suspected the elements should be checked individually with an ohmmeter Grounded elements may require a Megger for d...

Page 15: ...r to the boiler 2 Drain boiler below level of flange containing defective element 3 Number and tag element wires and terminals to assure proper reassembly 4 Disconnect element wires to the flange 5 Re...

Page 16: ...NT FLANGE ELEMENT TIGHTEN 70 FT LBS MAX BRASS 110 FT LBS MAX S S TIGHTEN ENOUGH TO BULGE RUBBER SEAT IN FLANGE 5 3 4 Probes Level probes should be periodically checked If there is any seepage between...

Page 17: ...Page 17 of 18 Vapor Power International LLC 551 S County Line Road Franklin Park Il 60115 Phone 630 694 5500 Fax 630 694 2230...

Page 18: ...Page 18 of 18 Vapor Power International LLC 551 S County Line Road Franklin Park Il 60115 Phone 630 694 5500 Fax 630 694 2230...