2 Preparing for Installation
This chapter provides a site preparation checklist, safety information, unpacking instructions,
and installation instructions.
2.1
Site Preparation Checklist
Before installing the 8620 DET, ensure the following items:
• The use of a protective canopy or sunshade is recommended in order to shield the
driver entry terminal from direct sun, rain, and snow
• Adequate space for installation
• The appropriate communication lines back to the FuelsManager Oil & Gas Terminal
Automation system
• Power (AC or DC)
• Grounding
• Enclosure protection, such as concrete barrier poles to prevent trucks from damaging
the unit
2.2
General Safety Guidelines
The user shall follow safety guidelines provided by the Occupational Safety and Health
Administration (OSHA) for additional protection. Information may also be obtained from the
following sources:
• National Electrical Code (NEC)
• National Fire Protection Association (NFPA)
• Instrument Society of America (ISA)
• FM Approvals (FM)
• Underwriters Laboratories Incorporated (UL)
When in doubt about the safety of an area, check with the local safety authorities. Always
observe equipment labels and warning signs posted in the area.
2.3
Installation Safety Guidelines
This equipment should be installed only by qualified personnel familiar with the installation of
display and monitoring equipment.
Caution should be exercised when any area that is posted or otherwise assumed to contain
hazardous gases. Always follow OSHA guidelines.
To prevent shock hazards, the housing of all units should be properly grounded in accordance
with the National Electrical Code. A grounding conductor should be wired to the grounding
terminal provided on the 8620 DET.
! Warning Before attempting installation of the 8620 DET, review the “General Safety
Guidelines” section above. Installation and maintenance personnel should
become familiar with any hazards present as well as any agency requirements
before working with any equipment.
Obtain a hot work permit before performing maintenance on the 8620 DET with power applied.
Summary of Contents for Data Entry Terminal 8620 Installation and opertions
Page 2: ......
Page 6: ...vi Installation and Operations Manual...
Page 8: ...Contents viii Installation and Operations Manual...
Page 12: ...Introduction 4 Installation and Operations Manual...
Page 16: ...Preparing for Installation 8 Installation and Operations Manual...
Page 22: ...Wiring 14 Installation and Operations Manual...
Page 26: ...Configuration 18 Installation and Operations Manual...
Page 36: ...Specifications 28 Installation and Operations Manual...
Page 38: ...Ordering Information 30 Installation and Operations Manual...
Page 39: ......