Pre-installation Checklist
Varian 1200/1200L Mass Spectrometer
Use this checklist as a guide while preparing your site for the installation of the Varian 1200 or
1200L MS system. Make sure that your site meets all of the requirements detailed in these
instructions before you request installation.
Complete the Checklist
Refer to the appropriate topics in these instructions for more information about each item.
General Requirements
The installation area is in compliance with all
relevant safety regulations
The principle operator will be available during
the installation and certification period
Entrance to the lab is > 100 cm (36 in.)
The workbench can support the load of the
system
Sufficient bench space is available for all
equipment, including optional items
Environmental Requirements
The lab temperature can be maintained
between 15 and 30 ºC
The relative humidity can be maintained
between 40 – 80%
The lab is free of particulate matter
The system workbench is free from vibrations
The system area is free from electromagnetic
disruption and electrostatic discharge
There is a suitable exhaust system
Power Requirements
The specified electrical supply and power
outlets are available
Gas and Solvent Requirements
There is proper gas equipment
Nitrogen at 99.999% purity
n/a
Argon at 99.999% purity
n/a
Air at 99.999% purity
n/a
Methane
at 99.999% purity
n/a
HPLC solvents available
n/a
Carrier gases are available
Appropriate lab glassware is available
n/a
Request Installation
When you have prepared your site in accordance with this checklist, contact the Customer Service
office in your region to schedule installation. Keep this checklist handy and review it with the Field
Representative when arranging the installation.
Please Note: If the laboratory is not ready for installation when the Field Service Representative
arrives, Varian, Inc. reserves the right to invoice for the Representative’s time.