959D Leak Detector
2-19
2.8.3 Starting After Short-term Shutdown (Standby)
No special steps are required for preparing the leak detector for operation when the green
FIL. indicator is illuminated and the system pressure is in the green band in the vertical dis-
play. If necessary, tune and calibrate the leak detector (Section 2.5 “Calibration and Tuning”
on page 2-11) before running a test.
2.8.4 Temporary Power Loss
The occurrence of a temporary power loss followed by power restoration can be recognized
by the following symptoms:
❑
The green FIL indicator is not lit
❑
The mechanical pump is running
❑
The HI VAC OK pressure indication is lit
1. Set the
FIL.
switch to the
ON/AUTO
position and release it.
This may have to be repeated several times. The green FIL. indicator should remain lit.
2. If the filament does not light, move the filament selector switch to the other filament and
try to light it again.
3. If the filament still does not light, perform a complete shutdown, wait a few minutes,
and then start the leak detector following the start-up procedure.
4. If the
filament still does not light, replace the ion source.
See Section 3.4.1 “Removing the Ion Source” on page 3-6 for the replacement
procedure.
5. Allow 1/2 hour for the pumps to warm up and the leak rate to stabilize; then tune and
calibrate the leak detector (see Section 2.5 “Calibration and Tuning” on page 2-11).
You can proceed with testing.
Summary of Contents for 959D
Page 16: ...959D Leak Detector 1 2 D R A F T 9 1 3 0 2 Figure 1 1 Model 959D Leak Detector ...
Page 28: ...959D Leak Detector This page intentionally left blank D R A F T 9 1 3 0 2 ...
Page 48: ...959D Leak Detector This page intentionally left blank D R A F T 9 1 3 0 2 ...
Page 68: ...959D Leak Detector This page intentionally left blank D R A F T 9 1 3 0 2 ...
Page 78: ...959D Leak Detector This page intentionally left blank D R A F T 9 1 3 0 2 ...
Page 81: ......