2-2
C A U T IO N
If the Archon is to be shipped for any reason, the shipping screw
and spacer must be installed or serious damage will occur! See
Section 7.15
Before turning the instrument on: Check the eight blue reverse ferrule
fittings located in the sample area behind the rear panel (Section 11,
para. 11.2 and 11.4). Unscrew each fitting. Verify that the ferrule is
pushed over the tubing until the end of the tubing can be seen.
Replace and snugly tighten the nut.
Remove back panel. Locate the waste lines. Route lines through slot.
2.3
Parts and Materials Included in the Accessory Kit (DY-505224-90)
The following items are included with the Archon Accessory Kit. Note: Remote I/O
cables are not included with the Archon, they must be purchased separately. See
Section 10 for a list of cables and kits.
Operator's Manual
Blue aluminum nut
Tefzel® flange-free, ferrule, 1/16”
6 x 15 mm stir bars, pkg. of 6
1 ea. 80 oz. safety coated bottle
22 mm low-bleed septa, pkg. of 60
EPA 40 ml water vials and caps, pkg. of 12
51 position sample tray (note this is shipped in a separate box)
Composite warning labels
Water Transfer Line, SS, 1/16” x 5’ long
Stir bars (soil), pkg. of 6 (supplied with SoilVial® version only)
2 ea. SoilVial® (supplied with the SoilVial version only)
2 ea. Standard reservoir
2.4
Lab and Bench Space Requirements
The Archon requires bench space behind the instrument for the electrical and
helium gas connections. An additional 17” overhead clearance is required to allow
the cover to be opened.
From the rear of the Archon extend flexible tubing (approximately 60”/1.5M) to be
connected to a blank water reservoir (80 oz./2L bottle) and to a user-supplied
waste receptacle(s). The waste receptacles must be located at or below the
height of the Archon base for proper drainage. Typically, both the blank water
reservoir and waste receptacle are placed on the floor behind the laboratory
bench.