Site Preparation / Installation
03-914642-00:6
2-7
grouped together. The method parameters, “First Vial - Last Vial”, will determine
what vial numbers are run together.
The Archon vial gripper calibration coordinate settings must now be checked as
factory settings may have changed during shipping, therefore run the
“Calibration Test” procedure as described in Section 6.4.
Note: If any error messages appear while runing the Calibration Test, refer to
Section 9-1. Refer to Section 6.4 for detailed calibration instructions.
Figure 2-4
2.10
Sample Tray Coolant Setup (Optional)
The Archon sample tray can be cooled by an optional, refrigerated chiller bath
(P/N DY-505627-00), and plumbing kit (DY-700085-90) that can be attached to
the coolant coil. It is located inside the cabinet under the tray. The tray rests on
top of the coil allowing conductive transfer of temperatures. See Figure 2-4. The
coolant connections are located on the rear panel at the lower right corner and
are labeled “Tray Coolant, IN - OUT.” The tubing is 3/8" Duro. Refer to the
instructions included with the coolant and plumbing installation kit.
When the sample tray cooler is used, the drip pan drain MUST have a 1/4" ID
hose attached and be routed to a suitable drain. See Section 7.12 for cleaning the
drip pan.
2.11
Archon Soil Transfer Line Installation
This section will discuss the installation of the Archon sample transfer lines and
purge gas cut off solenoid valve lines to the purge and trap. This section will
explain the installation to the Tekmar 3000, 2000, and OI 4560.
Tray Posts
Tray Rollers
Door Latch
Drip Pan Drain