I
NSTALLATION
ProStar 335 Photodiode Array Detector
69
Installing a flowcell
The ProStar 335 detector is not shipped with a flowcell installed.
You will need to install the flowcell that you purchased with the
detector. Each flowcell comes with a set of nuts and ferrules that
need to be fitted to tubing as shown in Figure 11.
Figure 11 PEEK
tube with ferrule and nut fitted.
Tubing connections are PEEK
type, except for the Super Prep
flowcell which uses Tefzel® tubing 0.125 x 0.062.
Table 3 Compatible tubes, nuts and ferrules for each flowcell
Flowcell type
Part number
Description
All except 4 x 0.15
16-101265-00
Fitting 1/16 tube nut/ferrule flat bottom
(Pack of 10)
4 x 0.15
16-101269-00
16-101264-00
Fitting 1/8 tube nut flat bottom (each)
Fitting 1/8 tube ferrule (Pack of 10)
Nut
Ferrule
PEEK
tube