ProStar 363 Fluorescence Detector
21
Operation
Turning on the Power
Turn on the Power switch of the detector.
An initialization test is carried out when the unit is powered up.
During the initialization period, the lamp is ignited, the
monochromators are initialized, and the output is autozeroed.
NOTE:
The sequence of events described in this section are
automatically performed when the instrument is powered up. If
the status display screen does not appear on the LCD within
three minutes after turning on the power, or if an error message
appears on the LCD, refer to the Maintenance and
Troubleshooting section.
Liquid Crystal Display (LCD)
Varian ProStar 363 Fluorescence Detector
Firmware P/N xxxxxxx-xx (Year)
After a short period of time, the monitor display presents:
WL DRIVE & LAMP INITIALIZING
The sequence of initializing the monochromator, turning on the
lamp, and auto zeroing the instrument is performed during this
period.
Summary of Contents for ProStar 363
Page 2: ......
Page 6: ...iv 03 914875 00 1...
Page 20: ...14 03 914875 00 1...
Page 82: ...76 03 914875 00 1...