ProStar 363 Fluorescence Detector
3
Installation
General
The modular design of the ProStar 363 Detector enables you to
locate it anywhere within the limitations imposed by the length of
the power cord and signal cables. In order to keep liquid dead
volume as low as possible, the detector should be positioned so
that distance between the column outlet to the flow cell inlet is as
short as is practical.
Flow cell fittings (inlet and outlet tubing) are located in the front
panel.
All power and signal cable connections are made on the back
panel. The power switch is located on the front panel of the unit.
Prior to installation, please make preparatory arrangements for
satisfying the installation requirements according to this manual.
If relocation of this instrument becomes necessary after its initial
installation, please notify your local Varian sales representative
or nearest Varian service office.
Before unpacking, make sure that the bench top to be used is
sturdy, level and can support the weight of the entire
chromatographic system.
Receiving Inspection
Inspection and unpacking instructions have been provided in the
ProStar pre-installation instructions prior to delivery. It is
repeated here for future reference.
Summary of Contents for ProStar 363
Page 2: ......
Page 6: ...iv 03 914875 00 1...
Page 20: ...14 03 914875 00 1...
Page 82: ...76 03 914875 00 1...