2.3 CONNECTION PROCEDURE
2.3.1 Cabling
Use a screwdriver to remove cable knock-outs for the
installation of cabling to the control panel.
2.3.2 Connecting a Unit
Refer to figure 2 for standard actuators, to figure 3 for
actuators using a Hired Hand switch box (PVR-2) or to
figure 4 for a 3 phase actuator.
A temperature probe can be outside the building (see
sections 2.4.2 and 3.2.3.6).
Do not apply power to the control panel until all
connections have been completed. The current draw
of the load should be in the range of 100mA to 5A
when it is activated. Set the voltage switch inside the
SVIM-1 to the correct value before power up.
Note: It is recommended to use the actuator on the
longest travel time possible to obtain maximum
accuracy in the curtain’s positioning.
Some actuators have a maximum functioning time.
The calibration must be done within the maximum
time, in order to avoid overheating motors.
(Also see
3.2.3.12, page26)
The maximum actuator travel time (opening or
closing) must not exceed 45 minutes.
www.monitrol.com
Summary of Contents for SVIM-1LE
Page 1: ...SVIM 1LE User s Manual www monitrol com ...
Page 11: ...Page 11 Fig 2 SVIM 1LE Wiring Diagram CHAPTER 1 INSTALLATION www monitrol com ...
Page 18: ...Page 18 SVIM 1LE www monitrol com ...
Page 19: ...Page 19 CHAPTER 3 USER S GUIDE www monitrol com ...
Page 30: ...Page 30 SVIM 1LE NOTES www monitrol com ...
Page 31: ...Page 31 APPENDIX APPENDIX www monitrol com ...
Page 36: ...MAV SVIM 1LE VER 04 01 July 17 2001 Chip 110e www monitrol com ...