Read this page entirely BEFORE beginning installation
.
VARIMIXER INSTALLATION INSTRUCTIONS
The mixer must be mounted with the rubber feet, which neutralize both shaking and rusting. Spacers
can be inserted under the mixer’s feet if the floor is uneven. The mixer can be bolted to the floor if d
esired.
Before the mixer is connected to power, it should be checked that the voltage and frequency on the
rating plate is correct in relation to the place of installation. A unit labeled 220V 3 Phase will operate
from 208V to 240V 3 phase safely. The rating plate is located on the rear right side of the mixer. The
electrical connection box is located at the top rear of the mixer.
WARNING
Electrical and grounding connections must comply with applicable portions of the National Electrical
Code and/or other local electrical codes.
...............................................................ire
Wire Color Codes
White-Phase 1
Red -Phase 2
Black-Phase 3
Green-Ground
No Neutral is used in the United States and Canada
1. Lower the bowl using the bowl lift lever or the
bowl lift switch on the front panel.
4. Close bowl screen and raise
the bowl arms into the up
position.
5. Turn timer to 10 minutes and
push “start” .
6. Insure cover is rotating in
the correct direction.
4
UNDER NO CIRCUMSTANCES ARE THE SPEED LEVER, BOWL LIFT LEVER, OR THE BOWL
ARMS TO BE USED TO MOVE THE MIXER INTO PLACE. DAMAGE WILL RESULT TO THE UNIT.
IT IS RECOMMENDED THAT THE TOP LID BE REMOVED BEFORE MOVING THE UNIT.
2. Open the bowl screen. 3. Remove the bowl
and tools.
Summary of Contents for W80
Page 11: ...Notes 10 ...
Page 12: ...11 ...
Page 14: ...13 ...
Page 16: ...15 ...
Page 18: ...17 ...
Page 20: ...19 ...
Page 22: ...21 ...
Page 24: ...23 ...
Page 26: ...25 ...
Page 28: ...27 ...
Page 30: ...29 ...
Page 32: ...31 ...
Page 34: ...33 ...
Page 36: ...W80 W100 Wiring Diagram with Power Bowl Lift 1988 1996 35 ...
Page 37: ...W80 W100 Wiring Diagram with Power Bowl Lift 1988 1996 36 ...
Page 38: ...W80 W100 Wiring Diagram with Power Bowl Lift 1996 37 ...
Page 39: ...This page intentionally left blank 38 ...
Page 40: ...W80 W100 Front Panel Wiring Diagram with Power Bowl Lift 2005 Present 39 ...
Page 41: ...W80 W100 Power Supply Wiring Diagram with Power Bowl Lift 2005 Present 40 ...
Page 42: ...5489 Campus Drive Shreveport LA 71129 800 222 1138 318 635 3131 Fax www varimixer com ...