EP E

 series

11-03

8

Illustrations may differ from the actual product 

Allowing for printing errors and errors on proofs

Circulation pump

Connecting the circulation pump to the boiler allows you to utilise 

the pump stop function, which also operates the pump briefly 

when it is not in use. The function can be disabled for continuous 

operation. Max 2 A. Important: 230 V. 

2

External unit

Fused socket for supply to external unit, max 2 A. Important: 230 V.

2

Load guard

The load guard uses current transformers to measure the load on 

the main fuses.
The size of the main fuse, 35-125 A, is set on the PCB.
Position the current transformers on the cables from the fuses to 

be protected, usually the main fuses. The connecting cable must 

be high current insulated, with a cross-sectional area of at least 

0.75 mm

2

. The common conductor is connected to terminal 4.

If the function is not required, the current transformers do not need 

to be connected.

1

2

3

4

3

External alarm indication

There is a voltage-free alarm, indicating a triggered overheating pro-
tection., max 230V~, 2A.

2

Electrical installation

  Electrical installation must be in accordance with the 

applicable regulations, under the supervision of an 
authorised installer.

The boiler and water heater must be filled with water before 
electrical installation begins.
An all-pole circuit breaker must be installed ahead of the boiler.
The minimum cross sectional area of cable for external units con-
nected to the boiler is 1.5 mm

2

.

The ambient temperature must not exceed 30°C.
Sensor cables must not be laid next to power cables.
The internal connections of the boiler are already made in the factory, 
and external connections are made according to the wiring diagram.

  Do not drill into the cover panels of the boiler

– the residues may harm the electronics.

Power limit

The power of the electric boiler can be limited. See “Electronic con-

Electronic con-

trol - settings”.

Restart after a power failure

The boiler restarts automatically after a power failure.

Power supply cable - EP 26 E

A five-core power supply cable is connected to the terminal in the 

boiler, max 16 mm

Cu,

 

50 A fuse.

1

Power supply cable - EP 42 E

The power supply cable must be PEN or five-core, made of copper, 

max 25 mm

2

, 80 A fuse.

The phase conductors are connected to a contactor, and the earth 

conductor is connected to a neutral terminal.

1

PEN or 5-core

Summary of Contents for EP E Series

Page 1: ...Installation operation and care EP E Series 7 stage electric boilers EP 26E and EP 42E 2011 03 21 utg xxxxxx Ers tter 08 05...

Page 2: ...tures 4 Technical data 5 HVAC installation 6 Siting the boiler Cables and pipework Safety supply pipe Waterquality Frostprotection Flow requirement HVAC installation 7 Pressure drop diagram Direction...

Page 3: ...s are shown in bold Numberofpower stages 7 6 5 4 1 2 ON ON OFF OFF ON OFF ON OFF Cirkulationpump 3 OFF ON eco summer mode continuous operation Main fuse EP42 EP26 1 3 125A 100A 80A 63A 50A 35A ON ON O...

Page 4: ...onnected power according to the current heating requirement The power can be limited to four power stages For safety the boiler can handle zero flow in other words it does not need to be fitted with a...

Page 5: ...thread 34 Drain valve R15 35 Opening cover for electrical connections 36 Cable bushing 37 Adjustable base bolts EP 26 E EP 42 E Power 26 25 42 kW Current 37 9 61 A Power stage 3 75 6 kW Current stage...

Page 6: ...e the system watertight so that no new oxygen rich water has to be added and to ensure that the water is not oxygenated during installation In large systems it is virtually impossible to prevent leaks...

Page 7: ...ted statistical pressure on the suction side Closed expansion system 2 5 bar 100 kW and 110 C The safety and venting valves are mounted on the boiler safety pipe 2 5 bar 100 kW and 110 C The safety va...

Page 8: ...tallation Electrical installation must be in accordance with the applicable regulations under the supervision of an authorised installer The boiler and water heater must be filled with water before el...

Page 9: ...wer The temperature control within the boiler itself takes precedence so the boiler temperature setting should be slightly higher than neces sary for the system The boiler Power status light will flas...

Page 10: ...g 8 PCB 9 Indicator for power group one 10 Indicator for power group two 11 Indicator for power group three Wiring diagram EP 26 E 12 Alarm overheat protection triggered 13 Alarm relay 14 Control swit...

Page 11: ...eat protection triggered 1 2 3 4 1 2 3 4 1 2 1 2 3 4 1 2 3 2 3 4 5 6 9 7 8 11 10 12 13 14 15 16 17 18 19 20 21 1 22 23 40 13 Alarm relay 14 Control switch 15 Control fuse 16 Overheat protection power...

Page 12: ...f the power can be connected immediately after a loss of power lasting longer than three minutes The remaining power is delayed by an hour To test the boiler after it has been without power for exampl...

Page 13: ...ondition Ask the installer to demonstrate the settings and functions so you know exactly how to operate and care for the system Check the water pressure air may remain in the system for a while after...

Page 14: ...mited Check the setting see page 8 Number of power stages The boilers is being controlled by a 0 10 V signal The boiler temperature setting is too low Outdoor temperature compensa tion is connected th...

Page 15: ...ock 3 pole 1 1 16 00 06 End plate 1 1 16 00 09 Jumper 2 pole 6mm 1 1 16 00 11 Jumper 4 pole 6mm 1 1 16 00 12 End support 2 2 16 00 13 Bar bracket 1 1 40 16 00 18 Neutral terminal NPF 35 1 6 6 40 16 00...

Page 16: ...4644 226358 291 94 Kristianstad www varmebaronen se Sweden info varmebaronen se V rmebaronen AB retains the right to change the specification of included components without prior notice as part of it...

Reviews: