VARTA Split Core current sensor
If the energy store to be installed is to be cascaded with further energy stores
as the master
, then
carry out the following work steps.
If the energy store is used as a
slave
, then do
not
carry out the following work steps.
ATTENTION
Inverted phases.
Fault of the charging and discharging function.
Conductors L1, L2, L3 for house connection, current sensor and AC plug
must have the same phase assignment.
It is not sufficient to execute the connection as a
clockwise rotating field
.
ATTENTION
Soiling of the magnetic cores.
Current sensor is damaged.
Do not touch the magnetic cores.
Ensure a clean working environment.
To ensure the own consumption optimisation, the house network current sensor must record all val-
ues of consumption and infeed. For this reason, it is located right behind the consumption and feed-
in meter. The VARTA Split Core Strom-sensor consists of a terminal box and three folding transduc-
ers. Their nominal current is 50 A (maximum current 100 A) per phase.
The terminal box is designed for top hat rail mounting. The connection for the sensor cable included
in the delivery for connecting to the energy storage system is found in the terminal box. For the posi-
tion of the “current measurement” socket on the energy storage system, see page 36.
For the VARTA Split Core current sensor to record the consumption and feed-in performance correct-
ly, the following must be complied with:
The phase assignment L1, L2, L3 must correspond to a
clockwise rotating field
.
The arrows on the folding transducers must point towards the sub-distribution.
Summary of Contents for pulse neo
Page 1: ...VARTA STORAGE GMBH OPERATING MANUAL VARTA pulse neo ...
Page 35: ...35 All dimensions in millimetres Fig 2 Dimensions on the support plate ...
Page 77: ...As at 07 2021 Appendix a Connection diagram TN C network ...
Page 78: ...As at 07 2021 Appendix b Connection diagram TT network ...
Page 79: ...As at 07 2021 Appendix c Connection diagram TN C network with data logger ...
Page 80: ...As at 07 2021 Appendix d Connection diagram TT network with data logger ...