34
Assembly preparation
The section Installation is directed towards the electrical specialist.
Read the operating manual.
WARNING
Components are heavy.
This can lead to overburdened intervertebral discs, contusions and strains.
Carry out the works described in this chapter with 2 persons or suitable
aids.
Use suitable fasteners.
Suspending and connecting the energy store
Mark the positions of the upper right and left bore according to: Fig. 2, page 35 (position 1 in
the drawing)
Remove the support plate with batter converter from the drilling site so that no drill dust
gets into the device.
Drill both positions and turn in the screws so far that there remains approximately a 3 mm
gap between the wall and the screwhead.
Remove the carrying loops on the support plate.
Fit the support plate.
Check the horizontal position of the support plate.
Mark the other 4 bores (position
2
in the drawing).
Disconnect the support plate.
Drill four holes.
Fit the support plate.
Screw the support plate
firmly
to the wall.
Summary of Contents for pulse neo
Page 1: ...VARTA STORAGE GMBH OPERATING MANUAL VARTA pulse neo ...
Page 35: ...35 All dimensions in millimetres Fig 2 Dimensions on the support plate ...
Page 77: ...As at 07 2021 Appendix a Connection diagram TN C network ...
Page 78: ...As at 07 2021 Appendix b Connection diagram TT network ...
Page 79: ...As at 07 2021 Appendix c Connection diagram TN C network with data logger ...
Page 80: ...As at 07 2021 Appendix d Connection diagram TT network with data logger ...