Initial start-up and initialisation
The section Installation is directed towards the electrical specialist.
Switch-on conditions
The housing is closed and screwed.
The network cable is inserted.
The fuse on the house network is switched on.
Initialisation
Switch on the store with the
on/off button
.
The button is locked in the lower position.
The initialisation can be tracked on the LED ring of the
on/off button
.
LED ring colour
LED action
Operating condition
Green
Flashes once per second
(duration approx. 90 seconds)
System check
Green
Illuminates permanently
Operational
Red
Illuminates permanently
Probable error: The battery modules
are not yet configured.
Continue with the commissioning via the web interface
Error in the initialisation
Eliminate the fault before continuing with the initial start-up via the web interface.
LED ring colour
Possible cause
Remedy
On/off button is not pressed.
Press on/off button
Hood not correctly fitted
Open hood and then fit according to
manual.
White
Fuse not switched on
Switch fuse on.
No AC network connection
Check AC network connection and
create connection is necessary.
The switch is
defective
Check switch and replace it if neces-
sary.
Summary of Contents for pulse neo
Page 1: ...VARTA STORAGE GMBH OPERATING MANUAL VARTA pulse neo ...
Page 35: ...35 All dimensions in millimetres Fig 2 Dimensions on the support plate ...
Page 77: ...As at 07 2021 Appendix a Connection diagram TN C network ...
Page 78: ...As at 07 2021 Appendix b Connection diagram TT network ...
Page 79: ...As at 07 2021 Appendix c Connection diagram TN C network with data logger ...
Page 80: ...As at 07 2021 Appendix d Connection diagram TT network with data logger ...