background image

 

Performance Note 

 

 

All fog machines develop condensation around the output nozzle. Because this may result in some 
moisture accumulation on the surface below the output nozzle, consider this condensation when installing 
your unit. 

 

All fog machines may sputter small amounts of fog occasionally during operation and for a minute or so 
after being turned off. 

 

All fog machines have a recycling period after long bursts when the machine will shut itself down for a short 
period in order to heat up again. During this time no fog can be produced.  

 
Maintenance 
 

Do not allow the fog liquid to become contaminated. Always replace the caps on the fog liquid container and 
the fog machine liquid tank immediately after filling. After every 40 hours of continuous operation, it is 
recommended to run a cleaning solution composed of 80% distilled water and 20% ACETIC ACID through the 
system to prevent the accumulation of particulate matter in the heating element.   
 
The recommended cleaning regimen is as follows: 

1.  

Empty all fog liquid from the machine. Add cleaning solution to tank. Plug unit in and begin warm up. 

2.  

Run the unit in a well-ventilated area until the tank is almost empty. Do not allow the pump to run dry. 

3.  

Cleaning is now complete. Refill with fog liquid. Run the machine briefly to clear any cleaning solution from 
the pump and heater. 

4.  

Do not operate the fog machine without liquid at any time. 

 

Note:   All fog machines are prone to clogging due to the thick consistency of fog liquid and the high 

temperature at which it vaporizes. However, a properly maintained fog machine should provide years of 
reliable use. 

 

Clean with a dry cloth only. Store dry. 

 

Cleaning your fog machine regularly will help reduce costly replacement and repair charges. 

 

Storage 
 

1.  When storing run distilled water (not tap water) through the system as described in the cleaning  

 regimen above. This will help avoid any particles condensing inside the pump or heater. 

 

2.    It is strongly recommended to test-run the machine on a monthly basis in order to achieve its best fogging 

condition. A test-run consists of warming up the machine followed by a few minutes of emission. After that, 
follow Step 1 under Storage. 

 

 
 
 
 
 
 
 
 
 
 
 
 
 

Please read and save these instructions. 

Summary of Contents for VN 1000 dmx

Page 1: ...1000 dmx BEDIENUNGSANLEITUNG Congratulations on the purchase of your new VARYTEC FOG MACHINE Wir begl ckw nschen Sie zum Kauf Ihres neuen VARYTEC NEBELGER TES Read and save these instructions Bitte l...

Page 2: ...before filling its tank Always keep fog machine in upright position Turn off or unplug the machine when not in use This machine is not water proof If moisture water or fog fluid gets inside the housin...

Page 3: ...ir 1000 dmx Fog Machine make sure that there is no evident damage caused by transportation In the event that the unit s housing or cable is damaged do not plug it in and do not attempt to use it until...

Page 4: ...the unit The machine will stop to fog if the fluid is lower than usable level If you experience low output pump noise or no output at all unplug immediately Check fluid level the external fuse remote...

Page 5: ...achine becomes operational The Z 10 features the toggle switch function press once for continuous ON press again to release continuous ON function Z 40 10 meter wired remote controller with 6 3 mm jac...

Page 6: ...fog liquid from the machine Add cleaning solution to tank Plug unit in and begin warm up 2 Run the unit in a well ventilated area until the tank is almost empty Do not allow the pump to run dry 3 Clea...

Page 7: ...On Off function can be programmed using the DMX controller or the DMX control software being used by lighting and effects operator If Channel A has a value from 0 to 128 the unit is OFF Between the va...

Page 8: ...as set out in the table below The starting address is defined as the first channel from which the device will respond to the controller Please make sure that you do not have any overlapping channels...

Page 9: ...C Nebelger t immer vom Netz zu trennen Achten Sie darauf dass das Nebelger t stets aufrecht installiert ist Wird das Ger t au er Betrieb genommen ist das Ger t auszuschalten oder vom Netz zu trennen D...

Page 10: ...sungen Auspacken und auf Transportsch den untersuchen ffnen Sie den Au enkarton und stellen Sie sicher dass alle Teile die f r den Betrieb des Systems notwendig sind in einem einwandfreien Zustand ein...

Page 11: ...TEC VN 1000 dmx Gezir 1000 dmx Nebelger tes finden Sie unter Bedienung ber eine Fernbedienung Wichtig W hrend des Nebelns immer auf die Fluidtankanzeige achten Der Betrieb eines Nebelger tes ohne Flui...

Page 12: ...die ben tigte Betriebstemperatur erreicht hat leuchtet die gr ne LED auf der Fernbedienung auf Das Ger t ist nun einsatzbereit und der Nebelaussto kann durch Dr cken des roten Knopfes ausgel st werden...

Page 13: ...und 20 Essigs ure durch das System laufen zu lassen Dadurch lassen sich Ablagerungen im Heizelement vermeiden Bitte gehen Sie wie folgt vor 1 Entleeren Sie den Tank vollst ndig F llen Sie die Reinigu...

Page 14: ...anleitung beschrieben Dadurch vermeinden Sie dass Partikel innerhalb der Pumpe oder der Heizung kondensieren 2 Wir empfehlen Ihnen monatlich an der Maschine einen Testlauf durchzuf hren der aus einer...

Page 15: ...ie Ger te k nnen auch ber den DMX Controller oder die DMX software ber das Lichteffektfenster programmiert werden Zwischen den Werten 0 und 128 von Steuerkanal A ist das Ger t aus Zwischen den Werten...

Page 16: ...IP Schalter entsprechend untenstehender Tabelle einstellen Die Startadresse ist der erste Kanal auf den ein Ger t auf Signale vom Controller reagiert Bitte vergewissern Sie sich dass sich die Steuerka...

Page 17: ...Importeur B K Braun GmbH Industriestra e 1 D 76307 Karlsbad www bkbraun com...

Reviews: