VASNER
19
3. Drill
8 mm
holes in the wall or ceiling. Ensure you use the correct dowel
for solid walls, cavities, plasterboard walls, etc. It will depend on the con-
dition of your wall or ceiling.
6. Use 6 x 80 mm screws to secure the bracket to the wall or ceiling so that
the wall bracket’s corner drill holes lie flush with the wall.
7. Now fit the heater to the bracket and secure it in place by turning the
rotatable safety mechanism to ensure it is hanging safely.
Commissioning
Before use, visually inspect the heater and mains plug to ensure they are not
damaged.
1. Plug the heater into a standard socket with 230 V ~ 50 Hz A.C. voltage.
The heater does not have an additional power switch and is immediately
switched on when plugged in.
As an option, the heater and room temperature can be automatically
controlled using a thermostat/temperature controller. It is also possible
to use a timer as an adapter plug.
2. It takes approx. 10-15 min. for the heater to reach its full effect and for
pleasant warmth to be felt.
3. The heater is switched off by unplugging it and it can then cool down.
Note:
When the heater is switched on for the first time, there may be a slight
odour but this is not harmful to health. This odour will disappear after a
short period of time.
For rooms that have cooled down completely, it can initially take a while
until the walls have warmed up and the room becomes warm.
Thanks to its low energy requirements, the infrared radiation principle helps
to protect the environment and its resources.
GB
Summary of Contents for Citara T 300M Metall
Page 13: ...VASNER 13...
Page 23: ...VASNER 23...
Page 24: ...VASNER 24...
Page 26: ...VASNER 26...
Page 27: ...VASNER 27...
Page 28: ...VASNER VASNER COM...