Assembly Cont.
Connecting Chamber To Conveyor
Heater and mounting pins installed,
wires toward the back.
Position chamber onto conveyor.
Corner alignment tabs on chamber
slide into cutouts in conveyor. Note
heater wires are towards back of
conveyor. Attach chamber to con-
veyor with (6) screws, 3 each side.
Chamber alignment tabs
at four corners.
Install Sheet Metal Screws
(3 or 4 each side)
Front
Back
Printed Side
Heater Mounting screws
(2 each side)
7
Pass the three wires,
one at a time, thru
the hole in the con-
veyor bed.
Tan wires first then
the green wire.
Pull wire thru to
make the connec-
tions.
Note: Power cord must be unplugged and
belt removed to make heater connections.
Do not operate dryer without belt installed.
8
Check that the heater mounting pins are
installed before proceeding. Carefully lay
the conveyor on its side as shown.
9
Pg. 9
Summary of Contents for D-100
Page 16: ......