ASSEMBLY AND INSTALLATION
INSTRUCTIONS
T0431
WARNING:
TO AVOID RISK OF ELECTRICAL SHOCK, BE SURE TO SHUT OFF
POWER BEFORE INSTALLING OR SERVICING THIS FIXTURE.
NOTES: 1. Before installing, consult local electrical codes for wiring and grounding requirements.
2. Read and save these instructions.
Important to Know
1. Read all instructions carefully before installation and operation.
2. If you are not familiar with state and local electrical codes, it is recommended that you consult with a qualified
electrician.
3. Before installation, shut off power at the main fuse or circuit breaker box. Be aware that simply turning off the
wall switch is not sufficient to prevent an electrical shock.
4. This fixture requires a 120 VAC, 60 Hz power source.
5. Do not attempt to take the lantern apart; there are no serviceable parts inside.
Work Temperature: - 4°F~104°F
Page 1 of 3
180726
HARDWARE CONTENTS Note: Hardware not shown actual size.
Cross Bar
X1
Mounting Screw
X2
Headless Screw
X2
Wire Connector
X3
Lock Nut
X4
Ball Nut
X2
Rubber Pad
X2
AA
BB
CC
EE
DD
FF
GG