8
© 2008 VBrick Systems, Inc.
Step 2. Connect the Server
T
To set up the VOD-W server
1. Connect the monitor, keyboard, dongle, mouse, and network cables as described below.
Figure 1.
VOD 50W (Dell 1950 – Rear View)
Figure 2.
VOD 125/300W (Dell 2950 – Rear View)
2. If rack mounting the unit, mount the VOD-W server in the rack, using the rack mount
kit provided.
Note
The following steps explain how to connect Dell PowerEdge 1950/2950 servers. To
connect 1850/2850 servers, refer to the previous version of this manual that was
shipped with those servers. To view all VBrick product documentation, go to
www.vbrick.com/support/documentation
Summary of Contents for VOD-W Server VBrick v4.2.3
Page 6: ...vi Contents ...
Page 13: ...Server Overview VOD W Admin Guide 5 ...
Page 14: ...6 2008 VBrick Systems Inc ...
Page 24: ...16 2008 VBrick Systems Inc ...
Page 46: ...38 2008 VBrick Systems Inc ...
Page 50: ...42 2008 VBrick Systems Inc ...
Page 54: ...46 2008 VBrick Systems Inc ...
Page 73: ...Adding Storage to 1850 2850 Servers VOD W Admin Guide 65 ...
Page 74: ...66 2008 VBrick Systems Inc ...
Page 91: ......
Page 92: ...VBrick Systems Inc 12 Beaumont Road Wallingford Connecticut 06492 USA ...