Shrink Tunnel VC999 ST2/ST2 D
Maintenance
Page 74/96
Art. no. 593.767
2009-11-12
12. Lower the service door and use the two star knobs to lock it.
13. If necessary, clean the optional infeed and outfeed roller conveyors (1, 2) and re-attach them to the
machine.
12.2 Checks
Faults can often be detected during routine checks before they lead to downtime during production.
Half-yearly checks
•
Check the conveyor belt tension. Refer to the section "Checking the belt tension".
•
Check correct functioning of the sieves. Replace defective or no longer fully functional sieves.
•
Make sure that the door seals and protective curtains are functioning correctly and are not worn.
The sealing elements must be replaced if excessive steam escapes from the machine. Contact the
VC999 service team.
12.2.1
Checking the belt tension
A wire mesh belt (2) rotates around the belt cartridge (1).
A tensioning device via two spindles (3) ensures correct
wire mesh belt tension (A).
The wire mesh belt must be replaced immediately if the
spindles (3) have direct contact with the guide grooves
(B) when the conveyor belt is operating with a load.
Procedure
1.
Open the service door (Fig. 9/1, Pos. 15).
2.
Check the belt tension at the belt cartridge (1).
Situation A:
The belt tension is correct.
Situation B:
The belt tension is not correct. The wire mesh belt must
be replaced by the VC999 service team.
Fig. 12/7
Summary of Contents for 593.767
Page 4: ......
Page 41: ...Shrink Tunnel VC999 ST2 ST2 D Operation 2009 11 12 Art no 593 767 Page 41 96 Fig 9 3...
Page 82: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams Page 82 96 Art no 593 767 2009 11 12...
Page 83: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams 2009 11 12 Art no 593 767 Page 83 96...
Page 84: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams Page 84 96 Art no 593 767 2009 11 12...
Page 85: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams 2009 11 12 Art no 593 767 Page 85 96...
Page 86: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams Page 86 96 Art no 593 767 2009 11 12...
Page 87: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams 2009 11 12 Art no 593 767 Page 87 96...
Page 88: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams Page 88 96 Art no 593 767 2009 11 12...
Page 89: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams 2009 11 12 Art no 593 767 Page 89 96...
Page 90: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams Page 90 96 Art no 593 767 2009 11 12...
Page 91: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams 2009 11 12 Art no 593 767 Page 91 96...
Page 92: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams Page 92 96 Art no 593 767 2009 11 12...
Page 93: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams 2009 11 12 Art no 593 767 Page 93 96...
Page 94: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams Page 94 96 Art no 593 767 2009 11 12...