Shrink Tunnel VC999 ST2/ST2 D
Description of the machine
Page 18/96
Art. no. 593.767
2009-11-12
Control panel with touch screen display
Operation occurs via the control panel at the front of the machine. Individual parameters can be dis-
played and their values edited on the touch screen. A keyboard appears on the screen to enter data.
The START button, STOP button and the indicator lamp for the heater are located below the display.
Electric cabinet
The electric cabinet (26) is accessible from the rear of the machine. The power cord is routed into the
electric cabinet from either the top or the bottom.
Safety devices
The machine is equipped with various safety devices. These safety devices help to protect operators
against potential machine dangers. The safety devices include:
- Lockable main switch (2)
- EMERGENCY STOP button (8)
Belt cartridge
The belt cartridge (11) is the internal product transport unit. The belt cartridge can be accessed after
opening the service door (15). The belt cartridge is fitted with a wire mesh belt and equipped with a pro-
tective roller at the both ends. The protective rollers provide finger pinch protection at the transition point
to an optional infeed / outfeed roller conveyor.
When the belt cartridge is installed, it is connected to the drive motor via a mechanical coupler. The wire
mesh belt then rotates around the belt cartridge, conveying the products through the machine.
The lower spray nozzles are integrated in the belt cartridge. Sieves (12) in and below the belt cartridge
prevent contamination of the spray water. The sieves can be removed individually for cleaning.
Infeed roller conveyor (optional)
The infeed roller conveyor (19) is optionally available. It can be installed and de-installed without tools at
both sides of the machine.
The outfeed roller conveyor (optional)
The outfeed roller conveyor (3) is optionally available. It can be installed and de-installed without tools at
both sides of the machine.
Steam extraction fan
The steam extraction fan is accessible from the rear of the machine after removing the access cover
(22).
Summary of Contents for 593.767
Page 4: ......
Page 41: ...Shrink Tunnel VC999 ST2 ST2 D Operation 2009 11 12 Art no 593 767 Page 41 96 Fig 9 3...
Page 82: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams Page 82 96 Art no 593 767 2009 11 12...
Page 83: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams 2009 11 12 Art no 593 767 Page 83 96...
Page 84: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams Page 84 96 Art no 593 767 2009 11 12...
Page 85: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams 2009 11 12 Art no 593 767 Page 85 96...
Page 86: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams Page 86 96 Art no 593 767 2009 11 12...
Page 87: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams 2009 11 12 Art no 593 767 Page 87 96...
Page 88: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams Page 88 96 Art no 593 767 2009 11 12...
Page 89: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams 2009 11 12 Art no 593 767 Page 89 96...
Page 90: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams Page 90 96 Art no 593 767 2009 11 12...
Page 91: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams 2009 11 12 Art no 593 767 Page 91 96...
Page 92: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams Page 92 96 Art no 593 767 2009 11 12...
Page 93: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams 2009 11 12 Art no 593 767 Page 93 96...
Page 94: ...Shrink Tunnel VC999 ST2 ST2 D Circuit diagrams Page 94 96 Art no 593 767 2009 11 12...