Transportation, packaging and storage prior to installation
• Great care should be taken when transporting the appliance, DO NOT drop as damage may
occur within the appliance.
• The unit must always be stored in a clean, dry environment.
• Remove all packaging before installation.
Pre-inspection
• Inspect the appliance and electrical supply cord for any damage.
• Check all accessories have been supplied.
• Inspect the appliance and supply cord for any damage. Any damage must be repaired by a
suitably qualified and competent person.
Parts list
1 x Vectaire WHHR125DC unit.
2 x Wall mounting brackets.
1 x Safety bracket.
1 x 15mm Drain connector.
4 x M6x10mm pan head screws.
4 x M6 washers.
Any parts shortages or faults must be reported to the supplier immediately.
Installation - mounting
1. Mark a horizontal line on the wall using a spirit level. This
line will be approximately 95mm below the location of the
top face of the unit when fitted (excluding duct ports).
2. Use one of the mounting brackets as a template to mark
the three fixing hole centres.
3. Drill holes for fixings, always use a fixing suited to the wall
type.
4. Mount one fixing bracket to the wall ensuring the inter-
locking side is at the top, as shown
Page 6
Installation