Run
9
________________________________________________________________________________________
_______________________________________
9
-
12
9.1.4 Setting glue start and stop adjustments.
During a running cycle, the edge
band material is fed across the
glue nozzle.
Immediately prior to it passing over
the nozzle, it activates the
tape present switch (911).
There are two sets of settings
on the control screen for adjusting
the delay between the activation
of this switch (911) and when the
PLC activates the dosing bar
air cylinder.
These are found on the Glue
Advance controls screen at
(996) and (997).
The start and stop settings at (996) control the glue start and glue stop for a 360 degree
butt join panel.
The start and stop settings at (997) control the glue start and glue stop for a non-360
degree panel. These are able to be set differently to a butt join panel. For thin tapes, it
might be desirable to delay the glue start to allow it to pass under the pressure roller
before the glue starts. This allows thin tapes to be pulled across the nozzle because in
some cases, they do not have sufficient stiffness and the tape presser can cause the band
to bunch under the tape presser.
These parameters are in 0.1mm increments so a value of 100 = 10mm
994
995
997
996
Tape Present Switch with
band about to touch
Tape Present Switch
911
911
Summary of Contents for Revolution 180
Page 1: ...Operating Manual...