2-4
Installing the Dektak 150 System
Figure 2-2: Back of the Dektak 150 Surface Profiler
PREPARING FOR INSTALLATION
This section tells you how to prepare an operating environment, unpack the Dektak 150 shipping
boxes, and remove the shipping brackets on the surface profiler. For instructions on installing the
system, see
Installing the System on page 2-9
.
Preparing Your Location
Prior to unpacking the system, you must make sure that your operating environment meets the
requirements outlined in
Appendix A, Facilities Specifications
. At the minimum, you must:
•
Ensure that the location is free from excessive air turbulence, vibration from machinery, dust
and dirt, or other environmental contaminants.
IMPORTANT!
The above factors will affect the profiler’s performance.
Electronics box
(E-Box)
Base
Cable manifold
on E-box
Vacuum connect
Z-axis lockdown
screw
Summary of Contents for Dektak 150
Page 1: ......
Page 7: ......
Page 17: ......
Page 81: ......
Page 105: ......
Page 149: ......
Page 191: ......
Page 251: ......
Page 257: ...A 6 Facilities Specifications Figure A 6 Dektak 150 without Enclosure Side View ...
Page 258: ...Facilities Specifications A 7 Figure A 7 Dektak 150 Dimensions without Enclosure Top View ...
Page 259: ...A 8 Facilities Specifications Figure A 8 Dektak 150 without Enclosure Center of Mass ...
Page 273: ......
Page 283: ......
Page 321: ......
Page 331: ......
Page 333: ......
Page 336: ......
Page 337: ......
Page 349: ......