1
Introduction
This manual describes how to identify and assemble the components of the Mag Plus Density Probes. Instructions
are included for assembling floats onto the probe’s shaft, attaching spacer rings to the probe’s canister, and
attaching the probe’s cable to the probe.
For guidelines on site preparation, instructions on installing the probe into a tank, and instructions on connecting
wiring from the probe to the console, you must refer to the appropriate Veeder-Root Site Preparation and
Installation manual.
For setup information, you must refer to the appropriate Veeder-Root Setup manual.
Important
Some of the installation kit components, such as epoxy packs, will be needed when installing the probe into the
tank. Do not discard any unused parts.
Make a record of the float size and Density Code that is installed on each probe. The installed float size and
Density Code will be required for each probe during system setup.
Contractor Certification Requirements
Veeder-Root requires the following minimum training certifications for contractors who will install and setup the
equipment discussed in this manual:
Installer (Level 1) Certification:
Contractors holding valid Installer Certification are approved to perform wiring
and conduit routing; equipment mounting; probe, sensor and carbon canister vapor polisher installation; wireless
equipment installation; tank and line preparation; and line leak detector installation.
ATG Technician (Level 2/3 or 4) Certification:
Contractors holding valid ATG Technician Certifications are
approved to perform installation checkout, startup, programming and operations training, system tests,
troubleshooting and servicing for all Veeder-Root Series Tank Monitoring Systems, including Line Leak Detection.
In addition, Contractors with the following sub-certification designations are approved to perform installation
checkout, startup, programming, system tests, troubleshooting, service techniques and operations training on the
designated system.
• Wireless 2
• Tall Tank
VR Vapor Products Certification:
Contractors holding a certification with the following designations are
approved to perform installation checkout, startup, programming, system tests, troubleshooting, service techniques
and operations training on the designated system.
• ISD – In Station Diagnostics
• PMC – Pressure Management Control
• CCVP - Veeder-Root Vapor Polisher
• Wireless – ISD/PMC Wireless
• A current Veeder-Root Technician Certification is a prerequisite for the VR Vapor Products course.
Warranty Registrations
may only be submitted by selected Distributors.
Related Manuals
After assemby, consult the appropriate Site Prep and Installation Manual for your console prior to installing the
probe in the tank.