background image

Page 1 of 1

CX180F_R Hardware Installation Guide D07-00-018 Rev C00

USER MANUAL

Please direct all questions to your local VeEX Sales Office, Representative, or Distributor. Or, contact VeEX technical support at 

www.veexinc.com. Copyright 2014 VeEX Incorporated. All rights reserved.

No part of this user manual may be reproduced, translated into a  foreign language, or be transmitted electronically without prior 

agreement and written consent of VeEX Incorporated as governed by International copyright laws. Information contained in this 

manual is provided “as is” and is subject to change without notice. Trademarks of VeEX Incorporated have been identified where 

applicable, however the absence of such identification does not affect the legal status of any trademark.

CX180F/CX180R

Forward and Return Path Monitoring System
Hardware Installation Guide

Summary of Contents for CX180F

Page 1: ...d translated into a foreign language or be transmitted electronically without prior agreement and written consent of VeEX Incorporated as governed by International copyright laws Information contained...

Page 2: ...3 2 Rear Panel 6 4 3 3 Grounding 6 4 4 Safety Guidelines 6 5 0 Installation 8 5 1 Installing the CX180F R in a Rack 8 5 2 Connecting the RF Ports 9 5 3 Connecting the Power 10 5 4 Disconnecting the P...

Page 3: ...About This Guide Every effort was made to ensure that the information contained in this installation guide is accurate Information is subject to change without notice and we accept no responsibility...

Page 4: ...version Panels and connectors may be hot 3 0 Safety Information Safety precautions should be observed during all phases of operation of this instrument The instrument has been de signed to ensure safe...

Page 5: ...aptor y y Mounting brackets y y AC Power adaptor y y Documentation CD 4 2 Tools Required y y Phillips Screwdriver 4 3 Product Features and Characteristics y y Primary power y y Secondary power y y Ser...

Page 6: ...guidelines to prevent injury during equipment installation and operation It includes the following y y Electrical Equipment Guidelines y y Chassis Lifting Guidelines Only trained and qualified person...

Page 7: ...A fully configured CX180F R weighs approximately 11 pounds 5 Kilograms The chassis is not intended to be moved frequently Before you install the CX180F R plan chassis placement and ensure that your s...

Page 8: ...rack Caution must be exercised when rack mounting this or any other type of equipment Ensure that all equipment is properly secured along the specified hardware Equipment must be installed in a safe m...

Page 9: ...hat it will operate within the speci fied operating temperature range 5 2 Connecting the RF Ports When connecting the QAM Burst Receiver ports to the HFC network take note of the following When connec...

Page 10: ...oon as the power switch is turned on 5 4 Disconnecting the Power 1 Turn the power switch of the CX180F R to OFF 2 Unplug the power plug from the DC power receptacle 5 5 Starting the System After insta...

Page 11: ...products that the customer elects to replace is returned to VeEX Inc by the customer along with proof of purchase within thirty 30 days of the request by the customer freight prepaid Additionally duri...

Page 12: ...tory Agency Compliance The CX180F R complies with the safety and regulatory agency standards listed below when installed in accor dance with this guide Product Safety Representative samples of this pr...

Page 13: ...erference to radio communications Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his o...

Reviews: