42
63138-US-200110
5.2 Normal Operation
Before putting the source holder into operational use, be aware of the
requirements for installing the source holder.
Source Holder Installation Requirements
The following statements are important in defining the requirements for the
installation of a source holder:
•
Regard each separate placement or relocation as a new installation.
•
Installation is the process of preparing the mounted source holder for
use and consists of the following:
•
Preliminary radiation survey
•
Leak test
•
Installation radiation survey
•
Shutter or cable mechanism operation test
•
Only a specifically licensed individual can perform the installation.
•
The specifically licensed person must use a calibrated survey meter and
must be present at the site during the entire procedure.
•
The licensee may perform future periodic tests by following the
instructions in this manual.
Summary of Contents for SHLD 2
Page 1: ...Operating Instructions SHLD 2 Source Holder Document ID 63138 Radiometric...
Page 2: ......
Page 8: ...6 63138 US 200110 NOTES...
Page 12: ...10 63138 US 200110 NOTES...
Page 26: ...24 63138 US 200110 NOTES...
Page 42: ...40 63138 US 200110 NOTES...
Page 56: ...54 63138 US 200110 NOTES...
Page 68: ...66 63138 US 200110 NOTES...
Page 78: ...76 63138 US 200110 9 2 Dimensions Figure 9 7 Source Holder SHLD 2 Standard Version...
Page 79: ...63138 US 200110 77 Figure 9 8 SHLD 2 Beam Angles Figure 9 9 SHLD 2 Height for Source Exchange...
Page 80: ...78 63138 US 200110 Figure 9 10 Source Holder SHLD 2 with Limit Switch...
Page 81: ...63138 US 200110 79 Figure 9 11 Source Holder SHLD 2 with Interlock Safety Switch...
Page 82: ...80 63138 US 200110 Figure 9 12 Source Holder SHLD 2 with Air Actuator...
Page 83: ...63138 US 200110 81 Figure 9 13 Source Holder SHLD 2 with Air Actuator and Limit Switch...
Page 84: ...82 63138 US 200110 Figure 9 14 Source Holder SHLD 2 Explosion Proof with Limit Switch...
Page 86: ...84 63138 US 200110 NOTES...
Page 87: ......