IG-313-EN version 02; 27/10/2022
13
General Instructions
Outdoor cubicles:
cgmcosmos
,
cgm
.3 and
cgm
.800 systems according to IEEE and CSA standards
Installation
Fastening outdoor cubicles with upwards gas output
to the floor / Fastening outdoor cubicles with upwards
gas output to the floor and cables 45° to the skid
Outdoor cubicles with upwards gas output must be
anchored to the floor of the facility in place at least in four
points prepared for this purpose in the base of the relief
duct. Take the following dimensions and diagrams into
account for anchoring. Ormazabal recommend to use for
anchoring M12 (8.8) hexagonal head screw DIN 933 plus
wide flange flat washer DIN 9021, galvanized steel coated
or similar.
For other configurations, please contact
Ormazabal
's
Technical Department.
Figure 4.1. cgm
.3
/
cgm
.800-lv
Figure 4.2. cgm
.3
/
cgm
.800-lvl
Summary of Contents for Ormazabal cgmcosmos
Page 27: ......