General Instructions
Operations sequence
42
cpg.1
Fully SF6 gas insulated single and double busbar GIS switchgears up to 36 kV in accordance
with IEC Standards
IG-137-EN version 03; 24/06/2016
7.3
cpg.1-s1
cubicle
Figure 7.16
Initial situation for
cpg.1-s1
cubicle
7.3.1 Connection
Initial conditions
: feeder disconnector open
and earthing switch open.
1. Connect the feeder disconnector by turning the lever
clockwise.
Figure 7.17
Lever turn detail
To put the equipment out of commission,
reverse the sequence of operation.
Summary of Contents for Ormazabal cpg.1 Series
Page 67: ......