Operations sequence
General instructions
59
cpg
.1
Fully SF6 gas insulated single and double busbar GIS switchgears up to 36 kV in accordance
with IEC Standards
IG-137-EN version 03; 24/06/2016
7.9.1 Commissioning the cubicle
Initial conditions
: feeder disconnectors open,
circuit breaker - disconnector open, earthing
switch open.
1. Connect the required feeder disconnector by turning
the lever clockwise.
Figure 7.67
Lever turn detail
2. Then connect the circuit breaker - disconnector by
turning the lever clockwise.
Figure 7.68
Lever turn detail
To put the equipment out of commission,
reverse the sequence of operation.
7.9.2 Earthing
Initial conditions
: right feeder disconnectors
closed, circuit breaker - disconnector closed,
earthing switch open.
1. Disconnect the circuit breaker - disconnector by
turning the lever anticlockwise.
Figure 7.69
Lever turn detail