background image

- 13 - 

 

6.6. 

Fasten the door holder No. 

49

 to the right crosspiece of the end 

with self-tapping screws No. 

46

, and fasten the hinge of the door 

holder on the lower door lintel for the holder to fix the door in the 

open position (see the figure above).

 

 

6.7.

 Insert door handles from set No. 

48

 to Ø12 apertures in the doors 

(be sure to pre-drill relevant holes in polycarbonate). Put the catch lock 

and cover plate on the backside, fasten the handle and cover plate with 

self-tapping screws No. 

46

 

 

 

   

 

  

 

 

6.8.

  Fasten door latch No. 

51

  with self-tapping 

screws No. 

46

  from inside between the lower 

and upper doors, so that the doors can be locked 

up with each other. For this purpose, unscrew 

the self-tapping screw in the door corner, mount 

the latch, and tighten the self-tapping screw 

again.

 

 

7. POSITIONING OF CELLULAR POLYCARBONATE ON THE ROOF  

 

IMPORTANT!

 

Prior to positioning Polycarbonate on the roof, make certain that the 

frame geometry is correct. 

Diagonal distance between the frame angles must be equal. 

Longitudinal stringers must be straight, free from curves and skewing. 

Be sure to remove the wrapping film from both sides of the sheet.  

The manufacturer marks the work face (sunward) of cellular 

polycarbonate with a certain mark (a color bar, sticker or other). 

Polycarbonate cellular lines must be located along the frame arches of 

the greenhouse. 

Summary of Contents for CAMELLIA

Page 1: ...de of 1 x1 Galvanized Steel Pipe Covered with High Density UV Polycarbonate Set of product Width 10ft 3m Height 7ft 2 10m Length of base 13ft 4m Optional Extension by 6 5ft 2m etc Thank you for cho os...

Page 2: ...s The greenhouse should be assembled and installed on the ground according the instruction The buyer should control the assembly quality if it is made by third person Self tapping screws of mount stru...

Page 3: ...5 End crosspiece lower central 910 mm with X inserts 2 7 Jamb post left 2030 mm 2 8 Jamb post right 2030 mm with apertures for door hinges 2 10 End crosspiece upper 960 mm 2 11 End crosspiece central...

Page 4: ...ng 2068 mm 6 6 28 End brace 600 mm 4 31 Fixing strap 20x6150 mm 7 3 40 Bolt 6 60 mm 35 15 41 Nut 6 35 15 42 Washer 6 49 21 43 Screw 4 35 mm 39 3 44 Nut 4 3 3 46 Self tapping screw 4 2 19 mm 458 66 47...

Page 5: ...onate mounting places are only indented To comply with the correct geometry the assembly must be made on a flat surface Before assembly sort and decompose the details of the ends doors and intermediat...

Page 6: ...jamb posts to the arch with self tapping screws on both sides The spacing between the posts must be 910 mm 3 2 Connect lower side crosspieces No 4 with central straight arch No 5 fasten with self tapp...

Page 7: ...8 and side posts No 3 at 900 mm from the lower crosspiece and fasten with self tapping screws No 46 3 6 Use a Carpenter square to set the doorway angle 90 Fasten braces No 19 between central No 11 and...

Page 8: ...perture for the door handle must be to the left The upper door C aperture for the door handle must be at the foot and the door D aperture for the door handle must be at the top Use a Carpenter square...

Page 9: ...ne joint at 60 mm from the pipe end 4 2 Use self tapping screws No 46 to fasten crosspiece No 20 to the assembled arc 5 ASSEMBELING THE FRAME Base 13 L 4m Frame assembly diagram side view 5 1 Use bolt...

Page 10: ...al stringers Nos 26 27 Fasten the braces with self tapping screws No 46 having angle 90 between the end and the stringer preset usinga set square 5 8 Connect lug crossbar No 25 and lug stand No 24 usi...

Page 11: ...arch 6 5 L 2m E End face B The End Face A and End Face B are identically the same Quantity of Polycarbonate sheets for different size of Arch Greenhouse CAMELLIA 13 L x 10 W x 7 H 1 Base For the Ends...

Page 12: ...eenhouse we recommend sealing the joint of polycarbonate sheets along the entire length with a waterproof self adhesive tape dense tape or similar material 6 1 Put the 2100 6000 mm Polycarbonate sheet...

Page 13: ...rts 3 and 4 with self tapping screws No 46 via thermo washers No 47 according to the fastening pattern In a similar fashion position parts 2 5 6 on the second end Layout of polycarbonate sheets on the...

Page 14: ...the lower and upper doors so that the doors can be locked up with each other For this purpose unscrew the self tapping screw in the door corner mount the latch and tighten the self tapping screw agai...

Page 15: ...the strap in the place where there are two holes punched at 5 cm distance from each other position 2 so that such holes are opposite one another 7 4 Insert screw No 43 with two washers No 42 into the...

Page 16: ...el the site where the greenhouse will be installed 8 2 Dig pits or trenches of adequate length and width under the lugs 8 3 Install the assembled greenhouse so that lower crosspieces of the ends are o...

Page 17: ...ituation when harmful insect crawl into the greenhouse when it turns cold and eat fresh sprouts in spring If removal of sheets is impossible it is necessary to strengthen the arches from inside using...

Page 18: ...th period after 1 year of full coverage If the repair is determined to be covered under warranty and it is consumer responsibility to send required evidence as pictures and video of damaged or broken...

Page 19: ...under proper usage Due to the continuous improvement of the products the manufacturer reserves the right to make changes in the design without prior notice to the consumer The products are not subject...

Reviews: